Laserfiche WebLink
Task description: <br />Site: Eagle Mine <br />PROJECT IDENTIFICATION <br />Task #: 04A <br />Date: 7/27/2011 <br />User: DMC <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />I per day <br />(CRG) <br />Total unit Cost/Hour: $158.69 <br />Total Fleet Cost/Hour: $158.69 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Cat D8R Series II - 8U (2005) <br />310 <br />Universal <br />NA <br />20,740 <br />1.124 <br />23,303 LCY <br />Backfill one panel <br />Source of estimated volume: 700'L x 80'W x 10'D <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: 0 % <br />Average site altitude: 6,650 feet <br />Material weight: <br />2,850 lbs /LCY <br />Weight description: Sand - Damp <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />$39.08 <br />$81.13 <br />$0.00 <br />$38.49 <br />200 feet <br />515.8 LCY /hr <br />BULLDOZER WORK <br />Permit Action: Initial Bond <br />State: Colorado <br />County: Moffat <br />0.750 <br />1.200 <br />1.100 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(50% SL) <br />Abbreviation: None <br />Page 1 of 2 <br />Permit/Job #: M2011029 <br />Filename: MO29 -04a <br />CIRCES Cost Estimating Software <br />