My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-10_REVISION - P2011019
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2011019
>
2011-08-10_REVISION - P2011019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:37:37 AM
Creation date
8/18/2011 1:46:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011019
IBM Index Class Name
Revision
Doc Date
8/10/2011
Doc Name
FW request (MD-01)
From
DRMS
To
Oregon Energy, LLC
Type & Sequence
MD1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O la <br />Olb <br />Olc <br />02a <br />02b <br />03a <br />Seal 15 boreholes from original NOI <br />BOREHOLE <br />75.00 <br />$42,569.55 <br />$96,490.98 <br />$1,343.00 <br />$865.34 <br />$2,709.98 <br />$2,958.77 <br />MD1 Seal 34 additional boreholes <br />BOREHOLE <br />170.00 <br />MD1 Backfill 34 mud pits <br />LOADER <br />16.33 <br />Revegetate 15 drill pads (25' x 50') - original NOI <br />REVEGE <br />10.00 <br />MD1 Revegetate 34 additional drill pads /mud pits <br />REVEGE <br />20.00 <br />Mobilize reclamation crew /equipment <br />MOBILIZE <br />4.22 <br />SUBTOTALS: <br />295.55 <br />$146,937.62 <br />Task description: <br />Site: Maybell <br />PROJECT IDENTIFICATION <br />Task #: 000 <br />Date: 7/14/2011 <br />User: DMC <br />TASK LIST (DIRECT COSTS) <br />Reclamation cost summary <br />Permit Action: Initial Bond Permit/Job #: P2011019 <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />COST SUMMARY <br />Abbreviation: None <br />Filename: P019 -000 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $2,968.14 <br />Performance bond: 1.05 Total = $1,542.85 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $14,693.76 <br />TOTAL 0 & P = $19,204.75 <br />CONTRACT AMOUNT (direct + 0 & P) = $166,142.37 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 Total = 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 Total = $0.00 <br />Reclamation management and /or administration: 5.00 $8,307.12 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $28,011.87 <br />TOTAL BOND AMOUNT (direct + indirect) = $174,949.49 <br />Round to $175,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.