My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-11_PERMIT FILE - P2010026
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2010026
>
2011-08-11_PERMIT FILE - P2010026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:48 PM
Creation date
8/18/2011 1:45:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010026
IBM Index Class Name
PERMIT FILE
Doc Date
8/11/2011
Doc Name
3rd notice of deficiency
From
DRMS
To
Shell Exploration & Production Company
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O1 a <br />02a <br />03a <br />04a <br />05a <br />06a <br />07a <br />08a <br />08b <br />08c <br />09a <br />1 Oa <br />Demolition and Disposal <br />DEMOLISH <br />1--1 ---- M M M M ^-' I-. .-ti 1--1 ,--I .--4 <br />0.00 <br />$519,579.35 <br />$881,615.55 <br />$967.91 <br />$26,666.52 <br />$6,877.53 <br />$3,161.00 <br />$18,494.17 <br />$13,719.13' <br />$22,212.57 <br />$3,568.75 <br />$13,587.89 <br />$531,861.00 <br />Seal all open boreholes per regulatory <br />requirements <br />BOREHOLE <br />976.40 <br />Backfill and regrade storm water pond <br />DOZER <br />1.88 <br />Regrade site (excluding pond and access road) <br />DOZER <br />51.70 <br />Regrade site access road <br />DOZER <br />13.33 <br />Rip all regraded surfaces to a depth of 18 inches <br />prior to s <br />RIPPER <br />6.12 <br />Replace stockpiled topsoil over 12.2 acres <br />SCRAPERI <br />33.33 <br />Pinyon Pine / Utah Juniper 3.91 acres <br />REVEGE <br />3.61 <br />Revegetate 6.66 acres mid -slope community <br />REVEGE <br />6.66 <br />Revegetate 1.63 acres of upland drainage <br />community <br />REVEGE <br />1.63 <br />Mobilization <br />MOBILIZE <br />8.00 <br />Subsurface Reclamation Costs <br />NETHOUR <br />250.00 <br />SUBTOTALS: <br />1349.05 <br />$ $2,042,311.37 <br />Task description: Reclamation Cost Estimate <br />Site: Multi - Mineral RDD Lease <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 8/10/2011 <br />User: THM <br />TASK LIST (DIRECT COSTS) <br />COST SUMMARY <br />Permit Action: Reclamation Est <br />Estimate Permit/Job #: P2010026 <br />State: Colorado <br />County: Rio Blanco <br />Agency or organization name: DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />500.00 <br />4.25 <br />5.00 <br />Abbreviation: None <br />Filename: P026 -001 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $41,254.69 <br />Performance bond: 1.05 Total = $21,444.27 <br />Job superintendent: 674.52 Total = $39,499.89 <br />Profit: 10.00 Total = $204,231.14 <br />TOTAL 0 & P = $306,429.99 <br />CONTRACT AMOUNT (direct + 0 & P) = $2,348,741.36 <br />Total = <br />Total = <br />500.00 <br />$99,821.51 <br />$117,437.07 <br />CONTINGENCY: 3.00 Total = $61,269.34 <br />TOTAL INDIRECT COST = $585,457.91 <br />TOTAL BOND AMOUNT (direct + indirect) = $2,627,769.28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.