Laserfiche WebLink
1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.3513 <br />Adjusted unit production: 222.83 LCY/hr <br />Adjusted fleet production: 668.49 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 3 Dozer(s) <br />Unit cost: $0.772/LCY <br />Total job time: 51.70 Hours <br />Total job cost: $26,666.52 <br />Task # 04A <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />