Laserfiche WebLink
producer hole #1 <br />8 in. (labor, equip, <br />materials) <br />East RDD <br />producer hole #2 <br />Portland cement grout - <br />8 in. (labor, equip, <br />materials) <br />7.125 <br />2285 <br />2,285.00 <br />LF <br />$13.25 <br />$30,270.31 <br />East RDD <br />observer hole #1 <br />Portland cement grout - <br />8 in. (labor, equip, <br />materials) <br />7.125 <br />2285 <br />2,285.00 <br />LF <br />$13.25 <br />$30,270.31 <br />East RDD <br />observer hole #2 <br />Portland cement grout - <br />8 in. (labor, equip, <br />materials) <br />7.125 <br />2285 <br />2,285.00 <br />LF <br />$13.25 <br />$30,270.31 <br />East RDD <br />Observer hole #3 <br />Portland cement grout - <br />8 in. (labor, equip, <br />materials) <br />7.125 <br />2285 <br />2,285.00 <br />LF <br />$13.25 <br />$30,270.31 <br />East RDD <br />observer hole #4 <br />Portland cement grout - <br />8 in. (labor, equip, <br />materials) <br />7.125 <br />2285 <br />2,285.00 <br />LF <br />$13.25 <br />$30,270.31 <br />East RDD <br />observer hole #5 <br />Portland cement grout - <br />8 in. (labor, equip, <br />materials) <br />7.125 <br />2285 <br />2,285.00 <br />LF <br />$13.25 <br />$30,270.31 <br />East RDD <br />observer hole #6 <br />Portland cement grout - <br />8 in. (labor, equip, <br />materials) <br />7.125 <br />2285 <br />2,285.00 <br />LF <br />$13.25 <br />$30,270.31 <br />Surface casing <br />removal <br />Exposed casing removal <br />- 8 to 14 in. diameter <br />steel pipe (LF) <br />15 -20 in. <br />63 <br />63.00 <br />LF <br />$8.75 <br />$551.06 <br />Borehole Worksheet Cont'd <br />Page 2 of 2 <br />Job Hours: <br />Task # TTT <br />976.40 <br />Total Cost: $881,615.57 <br />CIRCES Cost Estimating Software <br />