Laserfiche WebLink
- culvert #2 - drainage <br />to pond under loadout <br />loop road <br />2ft. dia. CMP x <br />35'L <br />Pipe, corrugated metal <br />(CMP) - 24 in. diameter <br />pipe <br />35.00 <br />LF <br />$3.10 <br />$108.50 <br />Dump fees for non- <br />concrete building <br />material <br />tonnage est. at <br />75% CY <br />volume <br />USER PROVIDED <br />ITEM <br />758.00 <br />ton <br />$58.22 <br />$44,130.76 <br />Demo Worksheet Cont'd <br />Job Hours: 310.65 <br />Task # TTT <br />Page 7 of 7 <br />Subtotal <br />(unadjusted): $569,090.20 <br />Total Cost <br />(adjusted for <br />location): $519,579.35 <br />CIRCES Cost Estimating Software <br />