Laserfiche WebLink
• <br />• <br />SEDCAD 4 for Windows <br />r.- ,rinhf 100A -')Mn P -Meta I Ghw�h <br />Elevation <br />Area <br />(ac) <br />Capacity <br />(ac -ft) <br />Discharge <br />(cfs) <br />Dewater <br />Time <br />(hrs) <br />Emergency <br />6,945.00 <br />0.446 <br />3.128 <br />0.840 <br />3.14* <br />Discharge <br />6,945.50 <br />0.466 <br />3.356 <br />1.029 <br />2.68* <br />0.000 <br />6,946.00 <br />0.486 <br />3.594 <br />1.188 <br />2.42* <br />0.000 <br />6,946.50 <br />0.506 <br />3.842 <br />1.329 <br />2.40 <br />0.000 <br />6,947.00 <br />0.527 <br />4.100 <br />1.456 <br />2.25 <br />0.000 <br />6,947.50 <br />0.549 <br />4.369 <br />1.572 <br />2.15 <br />6,948.00 <br />0.571 <br />4.649 <br />1.681 <br />2.05 <br />6,948.50 <br />0.593 <br />4.940 <br />1.783 <br />2.05 <br />6,949.00 <br />0.615 <br />5.242 <br />1.879 <br />2.00 <br />6,949.50 <br />0.637 <br />5.555 <br />1.971 <br />1.95 <br />6,950.00 <br />0.660 <br />5.879 <br />2.058 <br />1.95 <br />6,950.50 <br />0.683 <br />6.215 <br />2.143 <br />1.95 <br />6,951.00 <br />0.706 <br />6.562 <br />2.223 <br />1.90 <br />6,951.50 <br />0.730 <br />6.921 <br />2.301 <br />1.95 <br />6,952.00 <br />0.754 <br />7.292 <br />2.377 <br />1.95 <br />Spillway #2 <br />6,952.50 <br />0.779 <br />7.675 <br />5.165 <br />5.45 <br />6,952.77 <br />0.792 <br />7.885 <br />6.938 <br />3.55 <br />Peak Stage <br />6,953.00 <br />0.804 <br />8.071 <br />8.509 <br />6,953.50 <br />0.830 <br />8.480 <br />10.421 <br />6,954.00 <br />0.857 <br />8.901 <br />12.033 <br />Spillway #1 <br />6,954.50 <br />0.915 <br />9.344 <br />17.078 <br />6,955.00 <br />0.975 <br />9.817 <br />63.138 <br />6,955.50 <br />1.004 <br />10.311 <br />115.523 <br />6,956.00 <br />1.033 <br />10.821 <br />184.415 <br />6,956.50 <br />1.033 <br />11.337 <br />267.274 <br />6,957.00 <br />1.033 <br />11.854 <br />363.838 <br />*Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. <br />Detailed Discharge Table <br />12 <br />Filename: E Taylor Sed Pond Active Mining Phase 10 24.sc4 Printed 12 -12 -2010 <br />Exh. 7 -ET -19 Revision Date: 12/31/10 <br />Revision No.: TR -81 <br />Combined <br />Elevation <br />Emergency <br />Perf. Riser (cfs) <br />Total <br />(ft) <br />Spillway (cfs) <br />Discharge <br />(cfs) <br />6,933.07 <br />0.000 <br />0.000 <br />0.000 <br />6,933.50 <br />0.000 <br />0.000 <br />0.000 <br />6,934.00 <br />0.000 <br />0.000 <br />0.000 <br />6,934.50 <br />0.000 <br />0.000 <br />0.000 <br />6,935.00 <br />0.000 <br />0.000 <br />0.000 <br />12 <br />Filename: E Taylor Sed Pond Active Mining Phase 10 24.sc4 Printed 12 -12 -2010 <br />Exh. 7 -ET -19 Revision Date: 12/31/10 <br />Revision No.: TR -81 <br />