My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-16_ENFORCEMENT - M2006010
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2006010
>
2011-08-16_ENFORCEMENT - M2006010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:56 PM
Creation date
8/17/2011 7:04:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006010
IBM Index Class Name
ENFORCEMENT
Doc Date
8/16/2011
Doc Name
Return Mail
From
Environment, Inc.
To
DRMS
Violation No.
MV2011003
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB -24 -2011 22:36 FROM:IRA PAULIN <br />7195376956 TO:DRMS P.3/8 <br />B. Reclaim the land affected outside of the permit boundary. The <br />stockpiles located outside of the permit boundary shall be placed inside <br />the permit boundary. Additional reclamation of the land outside the <br />permit boundary shall be conducted in accordance with the current <br />approved reclamation plan for the Feister Pit #1 2006 - 010). if this <br />option is chosen, reclamation must commence by May 12, 2011 and all <br />steps to complete reclamation must be completed by August 11, 2011.. <br />C. Transfer the permit to a different operator. The successor operator <br />will then be required to complete either option A or option B described <br />above under the purview of the Division. If this option is chosen, MS <br />Forest, LLC must submit and receive approval of an appropriate <br />permit transfer application. The application must be submitted by <br />May 12, 2011 and in an approvable form by August 11, 2011. <br />The Board imposes a CIVIL PENALTY for 62 days of violation at $100 per <br />day for a total civil penalty of $6,200. All. but $100 of the penalty is suspended if the <br />Operator complies with the corrective action in the time specified. The portion of <br />the civil penalty not suspended, $100, shall be due and payable within 30 days of <br />this Order's signature date. <br />DONE AND ORDERED this day of. 2011. <br />MS Forest, LLC <br />Feister Pit #1, M-2006-010 <br />M: V -2011 -003 <br />FOR THE COLORADO MINED LAND <br />RECLAMATION BOARD <br />Ira J. Pauli$ Chair <br />NOTICE OF APPEAL RIGHTS <br />This order becomes effective and final upon mailing. Any party adversely affected <br />or aggrieved by agency action may commence an action for judicial review by filing <br />a notice of appeal with the district court within thirty (30) days after the effective <br />date of this order, pursuant to section 24 -4 -106, C.R.S. (2010). In the event that an <br />appeal is filed, designations of record made in accordance with section 24 -4- 106(6), <br />C.R.S. should be served on the Board at: 1313 Sherman Street, Room 215, Denver, <br />CO 80203, Attention: Sitira Pope. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.