Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue slope contouring and subgrade preparation within the Phase 5 VLF. <br />Continue subgrade acceptance prior to SLF placement. <br />Continue SLF placement. <br />Continue subgrade acceptance prior to geomembrane deployment. <br />Continue geomembrane installation. <br />Continue obtaining samples and assisting in the process of DCF material at the DCF Process area. <br />Continue excavation and backfill of the existing (temporary) Phase 5 anchor trench. <br />Continue geomembrane exposure. <br />Continue installation of the high volume solution collection system. <br />Continue DCF placement. <br />Continue leak detection system installation. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V :: <br />CC &V held a weekly construction meeting on July 19, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. Geomembrane pre - construction topics were also <br />discussed during the meeting. <br />Ames Construction: <br />None <br />AMEC: <br />Jay Moore and Kim Morrison were on -site on 7/21/2011 and 7/22/2011 to observe /discuss project <br />activities, progress, and scheduling. <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly represe is our findings and observations for the week ending <br />July 23, 2011. <br />Joseph Hickey, CQA M <br />Approved By: <br />Date: July 23, 2011 <br />Date, 7tW -1 <br />amec <br />VLF Weekly Report WE 07.23.2011 <br />