Laserfiche WebLink
SEDCAD 4 for Windows <br />Rnmminhl �QOR _9M (1 Pamela I Crh, -K <br />0- <br />Left Right Retardance <br />Freeboard Freeboard Freeboard <br />Limiting <br />Bottom o <br />Sideslope Sideslope Slope ( /o) <br />Width (ft) Classes <br />Mult. x <br />Depth (ft) % of Depth <br />Velocity <br />(fps) <br />Ratio Ratio <br />(VxD) <br />40.73 cfs <br />12.00 3.0:1 3.0:1 2.1 D, B <br />1.00 <br />1 7.0 <br />Vegetated Channel Results: <br />Structure #8 (Pond) <br />is sump at Sta 17 <br />Pond Inputs: <br />Pond Results: <br />Initial Pool Elev: 100.00 ft <br />Initial Pool: 2.01 ac -ft <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />100.00 20.00 2.00:1 2.00:1 20.00 <br />Peak Elevation: 100.91 ft <br />Dewater Time: 0.74 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation - Capacity- Discharge Table <br />7 <br />Filename: taylor trib ditchl0024.sc4 Printed 12 -12 -2010 <br />Exh. 7- 14C -12 Revision Date: 12/31/10 <br />Revision No.: TR -81 <br />Stability <br />Class D w/o <br />Freeboard <br />Stability <br />Class D w/ <br />Freeboard <br />Capacity <br />Class B w/o <br />Freeboard <br />Capacity <br />Class B w/ <br />Freeboard <br />Design Discharge: <br />40.73 cfs <br />40.73 cfs <br />Depth: <br />0.78 ft <br />1.78 ft <br />1.25 ft <br />2.25 ft <br />Top Width: <br />16.66 ft <br />22.66 ft <br />19.51 ft <br />25.51 ft <br />Velocity: <br />3.66 fps <br />2.07 fps <br />X- Section Area: <br />11.14 sq ft <br />19.71 sq ft <br />Hydraulic Radius: <br />0.658 ft <br />0.990 ft <br />Froude Number: <br />0.79 <br />0.36 <br />Roughness Coefficient: <br />0.0446 <br />0.1037 <br />Structure #8 (Pond) <br />is sump at Sta 17 <br />Pond Inputs: <br />Pond Results: <br />Initial Pool Elev: 100.00 ft <br />Initial Pool: 2.01 ac -ft <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />100.00 20.00 2.00:1 2.00:1 20.00 <br />Peak Elevation: 100.91 ft <br />Dewater Time: 0.74 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation - Capacity- Discharge Table <br />7 <br />Filename: taylor trib ditchl0024.sc4 Printed 12 -12 -2010 <br />Exh. 7- 14C -12 Revision Date: 12/31/10 <br />Revision No.: TR -81 <br />