Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description <br />$84.12 <br />$125.00 <br />1 <br />1 <br />Subtotals : <br />$84.12 <br />$125.00 <br />$209.12 <br />-Water Tanker, 2,500 Gal. <br />- Pipe /pump truck <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non - <br />Roadable <br />Equipment <br />Haul time (hours) = 1.43 <br />Return time (hours) = 1.43 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 3.86 <br />JOB TIME AND COST <br />Total <br />Cost/hour /unit <br />Fleet Size Haul Trip <br />(No. units) Cost/hr /fleet <br />Return Trip <br />Cost/hr /fleet <br />$84.12 <br />$125.00 <br />$209.12 <br />Nearest major city or town within project area region : Monte Vista <br />Total one -way travel distance : 50.0 miles <br />Roadable Average travel speed : 35.0 mph <br />Equipment <br />1.43 Total non - roadable mob /demob cost * : $2,276.58 <br />1.43 * two round trips with haul rig <br />NA Total roadable mob /demob cost ** : $597.50 <br />NA " one round trip, no haul rig <br />2.86 <br />Total job time : <br />Total job cost : <br />7.71 <br />$2,874 <br />sheet 2 of 2 <br />hours <br />