My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-10_PERMIT FILE - P2011023
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011023
>
2011-08-10_PERMIT FILE - P2011023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:46 PM
Creation date
8/16/2011 2:02:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011023
IBM Index Class Name
PERMIT FILE
Doc Date
8/10/2011
Doc Name
Approval to commence prospecting
From
DRMS
To
Rio Grande Silver, Inc.
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User: <br />007 <br />08/10/2011 <br />RCO <br />Agency or organization name :DRMS <br />Permit or other job action : New NOI <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA <br />Area : <br />0.96 <br />HOURLY PRODUCTION <br />JOB TIME AND COST <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Source of estimated quantity :NOi <br />Source of estimated load factor :NA <br />Alternate methods - <br />Seismic : Seismic velocity : <br />Unadjusted production : <br />Area : Avg. ripping depth : <br />Average ripping width : <br />Average ripping length : <br />Average dozer speed : <br />Average maneuver time : <br />Production per unit area : <br />Unadjusted production : <br />Fleet size : <br />Unit cost : <br />1.00 <br />5.08 <br />200.00 <br />88.00 <br />0.25 <br />0.555 <br />894.97 <br />1 <br />$0.116 <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State : Colorado <br />County :Mineral <br />Site : South Upper Rat Creek <br />Task description :Rip compaction on road and pads <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />NA Load factor : <br />acres Rip depth (ft) : <br />NA feet/second <br />NA cu. yds. /hour <br />feet/pass <br />feet/pass <br />feet/pass <br />feet/minute <br />minutes /pass <br />acres /hour <br />cu. yds. /hour <br />dozer(s) <br />per cu. yd. <br />:Cat D5G LGP - 5P <br />:Power Angle Tilt <br />: ROPS Cab <br />:3-shank ripper <br />$17.85 <br />$24.13 <br />$1.93 <br />$38.54 <br />$82.45 <br />Permit/job # :P- 2011 -023 <br />Abbreviation :none <br />Filename : P023 -007 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Selected estimating method : Area <br />NA Bank volume : <br />1.00 Volume : <br />Job Condition Correction Factors - <br />Unadjusted production <br />per selected method : <br />Site altitude : <br />Altitude adjustment : <br />Job efficiency factor : <br />Net job correction : <br />Adjusted unit production : <br />Adjusted fleet production : <br />Horsepower : 90 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />NA BCY <br />1,549 BCY or CCY <br />894.97 cu. yds. /hour <br />11,500 feet <br />0.96 (Cat HB) <br />0.83 (1 shift/day) <br />0.80 multiplier <br />713.12 <br />713.12 <br />Total job time : 2.17 hours <br />Total job cost : <br />$179 <br />$82.45 <br />cu. yds. /hour <br />cu. yds. /hour <br />
The URL can be used to link to this page
Your browser does not support the video tag.