My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-11_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-08-11_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:49 PM
Creation date
8/15/2011 8:18:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
8/11/2011
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR91
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />August 11, 2011 <br />Kurt Blunt <br />Colowyo Coal Company L.P. <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />Re: Colowyo Coal Mine (Permit No. C- 1981 -019) <br />Proposed Decision - Technical Revision No. 91 (TR -91) <br />Terminate Monitoring of Streeter Fill Piezemeters <br />Dear Mr. Blunt: <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for Technical <br />Revision No. 91 at the Colowyo Coal Mine. Notice of the proposed decision will be published in the <br />Craig Daily Press as soon as possible. The first publication will initiate the ten (10) day public comment <br />period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. This Technical Revision must not be implemented until this <br />proposed decision becomes final and until any required increase in bond is submitted to and approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />Enclosure <br />inns <br />ental Protection Specialist <br />cc: Foster Kirby, Office of Surface Mining, with enclosures <br />CC -TR -06 C1981019 JHB 08112011030806.doc <br />Office of <br />Mined Land Reclamation <br />STATE OF COLORADO <br />Denver • Grand Junction • Durango <br />COLORADO <br />D I V I S I O N OF <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />Office of <br />Active and tractive Miaes <br />
The URL can be used to link to this page
Your browser does not support the video tag.