Laserfiche WebLink
EXHIBIT E RECLAMATION PLAN (CONT.) <br />more than a year, a vegetative cover of 3 #'s /200 FT Western <br />Wheatgrass or other means will be employed to prevent topsoil <br />erosion from wind and water and keep it free of contaminants so <br />that it remains useful for sustaining vegetation when reclamation <br />begins. The stockpiles will be located in areas where distur- <br />bances by ongoing mining operations will be at a minimum, i.e., <br />along setbacks on the pit perimeter or on the floor of the <br />previously mined areas. The topsoil will be handled as little as <br />possible until it is replaced onto disturbed areas. The operator <br />will take measures necessary to insure the stability of the <br />replaced topsoil on graded slopes and spreading it as evenly as <br />possible. Fertilizer and other soil amendments will be used as <br />discussed in the original reclamation plan. <br />AMENDMENT 5 - Revised Reclamation Timetable <br />RECLAMATION TIMETABLE <br />Reclamation will begin once enough area has been opened so <br />that any reclamation completed will not be disturbed as mining <br />progresses. This may take 5 or more years depending on the <br />economic conditions in the area and the amount of material mined. <br />Approximately 85% of the total mined land will be reclaimed by <br />the time mining is completed. We expect reclamation to be <br />complete on most of the south and east slopes by the time final <br />grading on the floor is needed. Shortly after mining ends, all <br />grading, resoiling and revegetation will be complete. The area <br />will then be monitored for success of revegetation until it is <br />released. The operator estimates that this will happen 3 to 5 <br />years after mining is completed. <br />If revegetation problems occur before release, an analysis <br />of the site will be made and the area will be revegetated again <br />as necessary. This gives us the most flexibility to complete <br />reclamation successfully. <br />This Timetable reflects the areas shown on the Reclamation <br />Plan map on the map plat supplied with this amendment. <br />ACRES ± <br />PHASE <br />EXISTING <br />AREA <br />NEW AREA <br />TOTALS <br />EXISTING <br />AREA <br />NEW AREA <br />TOTALS <br />YEARS <br />4 -6 <br />4 -6 <br />4 -6 <br />4 -6 <br />TOTAL <br />75.74 <br />28.54 <br />104.28 <br />75.74 <br />28.54 <br />104.28 <br />REVEGETATION <br />59.94 <br />26.70 <br />86.64 <br />64.98 <br />27.04 <br />92.02 <br />ROADS <br />1.60 <br />0.00 <br />1.60 <br />1.60 <br />0.00 <br />1.60 <br />SET- <br />BACKS <br />6.80 <br />1.84 <br />8.64 <br />1.76 <br />1.50 <br />3.26 <br />UNDIS <br />TURBED <br />7.40 <br />0.00 <br />7.40 <br />OPTION #2/3 <br />7.40 <br />0.00 <br />7.40 <br />10 (revised 8 -8 -11) <br />