My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-11_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2011-08-11_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:49 PM
Creation date
8/11/2011 1:33:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
8/11/2011
Doc Name
Letter Regarding Revised Reclamation Cost Estimate
From
DRMS
To
Bear Coal Company
Type & Sequence
SL4
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Bear Mine <br />PROJECT IDENTIFICATION <br />Task #: 004 <br />Date: 7/1/2011 <br />User: SLB <br />Agency or organization name: Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Cat D7R DS Series II - 7SU <br />240 <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Semi- Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Total unit Cost/Hour: $155.98 <br />Total Fleet Cost/Hour: $155.98 <br />MATERIAL QUANTITIES <br />1,440 <br />1.000 <br />1,440 LCY <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Average push gradient: 10 % <br />Average site altitude: 6,000 feet <br />Material weight: 2,650 lbs/LCY <br />BULLDOZER WORK <br />Rip and Regrade portal bench and access road <br />Permit Action: NA - New CIRCES <br />Program Rollover <br />State: Colorado <br />County: Gunnison <br />$48.37 <br />$64.94 <br />$4.18 <br />$38.49 <br />Source of estimated volume: Upper 9" of 1.19 acres backfilled by excavator <br />Source of estimated swell factor: Cat Handbook <br />Unadjusted hourly production: 1,022.9 LCY/hr <br />Materials consistency description: Dry, non - cohesive 0.8 <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 0.800 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />Abbreviation: None <br />Page 1 of 2 <br />Permit/Job #: C1981033 <br />Filename: CO33 -004 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.