My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-09_HYDROLOGY - M1987049
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1987049
>
2011-08-09_HYDROLOGY - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:40 PM
Creation date
8/10/2011 2:37:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
HYDROLOGY
Doc Date
8/9/2011
Doc Name
SWSP
From
OSE
To
Bishop-Brogden Associates, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s .�BBA <br />...r..ew..au.,,. e ueor•aa000rx AJJOCIAYrt. INC. <br />Table 1B <br />Ready Mixed - Bromley Lakes Site <br />Depletion Analysis (August 2011 - July 2013) <br />Proposed SWSP Operations <br />(all values in acre -feet unless <br />Notes: <br />[10] Total Lagged Depletions equals the depletions in column [9] lagged over 13 months plus depletions from previous lagging patterns. <br />[11] Number of days there was a call on the South Platte Rivet. Conservatively projected to have a call for the satire SWSP period. <br />[12] Out-of-priority depletion equals the fraction of the total site depletion that occurred whet theta was a cell on the South Platte River, equal to [10] ([11] / # of days in month). <br />[13] RMCCs Fulton fibre deliveries at RMCC's Erger Lateral or Brighton's Midland or 124th Ave augmentation stations, as reported by RMCC or Brighton. <br />[14] Fulton Ditch historical consumptive use (HCU) replacement credit from RMCC's 70 shares, equal to the lesser of 1.76 aF0/shardyear average historical consumptive use distributed monthly (based upon the SACWSD <br />change case engineering report for Case No 2001CW258), and the total Fulton Ditch Deliveries, [13], multiplied by the consumptive use factors presented in RMCCs SWSP renewal request (Apr -0281, May=0.687, <br />Jun 0.758, Jul.-0.786, Aug -.764, Sep-0.688, Oct4.465, based upon the engineering report for Case No 2001CW258). <br />[15] Total replacement requirement is the total of the out-of-priority depletion and the Fulton Ditch return flow obligation, equal to [15] - [17] if [17] is negative, otherwise equal to [15]. <br />[16] Fulton HCU credits delivered directly to the river. <br />[17] Required release of stored Fulton Ditch credits (or water pumped to storage during free river) to South Platte River in order to replace tie given month's depletion, equal to (15] - [16] if there is water in storage, Col [21). <br />[18] Stored Felton Ditch credits (or water pumped to storage during free river) released to South Plane River in order to replace depletions. Projcetlom calculated as the minimum oldie release requirement (equal to previous [ <br />+[17D and RMCCs previous BOM storage given in Col [21]. <br />[19] Surplus Fulton credits available far diversion to storage based en Fulton Ditch credits, [141 in excess of the out-of- priority depletions, [12]. <br />[20] Brighton lease repent equals [15] - [16] 418]. <br />[21] 'MCC' storage it Brighton's Kenneth Mitchell Lake 1. Equal to previous month% storage minus estimated evaporation and aug release plus surplus Fulton Credit. <br />[22] Remaining operations replacement requirement equals previous [22] + [15] - [16] - [18] - [20]. <br />ataeaaI ma+a our <br />Total <br />Lagged <br />Depletion <br />Number <br />ofDays <br />Out -of- <br />Priority <br />Out -of- <br />Priority <br />Depletion <br />Fulton <br />Share <br />Deliveries <br />Replacement <br />CU Credit <br />from Fulton <br />Ditch <br />Replacemeot <br />Retpuirement <br />HCU <br />Direct <br />To River <br />squired <br />Aug Release <br />From Storage <br />To River <br />Aug <br />From <br />Storage <br />To River <br />Fufton <br />Credit <br />righton <br />lease <br />Replacement <br />RMCCt <br />EOM Ken <br />Mitchell <br />Storage <br />Remaining <br />Operations <br />Replacement <br />Requirement <br />Month <br />[101 <br />(111 <br />[121 <br />[131 <br />[1 <br />[171 <br />[201 <br />[21] <br />[221 <br />Aug <br />26.9 <br />' 31 <br />26.9 <br />41.7 <br />31 <br />0 <br />0 <br />69.2 <br />Sep <br />33.5 <br />30 <br />33.5 <br />21.6 <br />1 <br />18.6 <br />18.6 <br />47.2 <br />Oct <br />27.6 <br />31 <br />27.6 <br />4.6 <br />2 <br />25.5 <br />25.5 <br />20.0 <br />Nov <br />20.5 <br />30 <br />20.5 <br />0 <br />-6A <br />26.9 <br />0 <br />20.0 <br />20.0 <br />0 <br />Dec 2011 <br />16.0 <br />31 <br />16.0 <br />0 <br />-6A <br />22.3 <br />0 <br />0 <br />0 <br />0 <br />Jut 2012 <br />12.5 <br />31 <br />12.5 <br />0 <br />42 <br />16.8 <br />0 <br />0 <br />0 <br />0 <br />Feb <br />10.3 <br />29 <br />10.3 <br />0 <br />-42 <br />14.5 <br />0 <br />0 <br />0 <br />0 <br />N <br />0 <br />co <br />Mar <br />93 <br />31 <br />9.3 <br />0 <br />-2.1 <br />11.4 <br />0 <br />0 <br />0 <br />0 <br />Apr <br />15.2 <br />30 <br />15.2 <br />15.1 <br />4.2 <br />15.2 <br />4.2 <br />0 <br />0 <br />0 <br />May <br />25.6 <br />31 <br />25.6 <br />30.9 <br />21.2 <br />25.6 <br />21.2 <br />0 <br />0 <br />0 <br />Jun <br />34.0 <br />30 <br />34.0 <br />42.0 <br />31.9 <br />34.0 <br />31.9 <br />0 <br />0 <br />0 <br />Jul <br />40.1 <br />31 <br />40.1 <br />51.3 <br />40.4 <br />40.1 <br />40.1 <br />0 <br />0 <br />0.3 <br />Aug <br />41.7 <br />31 <br />41.7 <br />41.7 <br />31.9 <br />41.7 <br />319 <br />9.6 <br />O O O O O O O O O O O O <br />Sap <br />37.1 <br />30 <br />37.1 <br />21.6 <br />14.9 <br />373 <br />14.9 <br />22.2 <br />Oct <br />31.0 <br />31 <br />31.0 <br />4.6 <br />2.1 <br />31.0 <br />2.1 <br />28.9 <br />Nov <br />24.1 <br />30 <br />24.1 <br />0 <br />-6.4 <br />30.5 <br />0 <br />30.5 <br />Dec 2012 <br />18.9 <br />31 <br />18.9 <br />0 <br />-6.4 <br />25.3 <br />0 <br />25.3 <br />Jan 2013 <br />14.8 <br />31 <br />14.8 <br />0 <br />-4.2 <br />19.0 <br />0 <br />19.0 <br />Feb <br />12.0 <br />28 <br />12.0 <br />0 <br />-42 <br />16.2 <br />0 <br />0 <br />O <br />16.2 <br />O <br />Mar <br />10.6 <br />31 <br />10.6 <br />0 <br />-2.1 <br />12.7 <br />0 <br />12.7 <br />Apr <br />16.1 <br />30 <br />16.1 <br />15.1 <br />4.2 <br />16.1 <br />4.2 <br />11.8 <br />May <br />26.0 <br />31 <br />26.0 <br />30.9 <br />21.2 <br />26.0 <br />21.2 <br />4.8 <br />Jan <br />33.9 <br />30 <br />33.9 <br />42.0 <br />3 L9 <br />33.9 <br />31.9 <br />2.0 <br />Jul <br />39.5 <br />31 <br />39.5 <br />513 <br />40.4 <br />39.5 <br />39.5 <br />0 <br />2011 -2012 Total <br />271.6 <br />366 <br />271.6 <br />207.3 <br />123.2 <br />295.0 <br />1413 <br />64.1 <br />64.1 <br />5.2 <br />893 <br />- <br />- <br />2012 -2013 Total <br />305.7 <br />365 <br />305.7 <br />207.3 <br />123.2 <br />329.1 <br />145.7 <br />0.3 <br />0.3 <br />0.9 <br />183.1 <br />- <br />- <br />s .�BBA <br />...r..ew..au.,,. e ueor•aa000rx AJJOCIAYrt. INC. <br />Table 1B <br />Ready Mixed - Bromley Lakes Site <br />Depletion Analysis (August 2011 - July 2013) <br />Proposed SWSP Operations <br />(all values in acre -feet unless <br />Notes: <br />[10] Total Lagged Depletions equals the depletions in column [9] lagged over 13 months plus depletions from previous lagging patterns. <br />[11] Number of days there was a call on the South Platte Rivet. Conservatively projected to have a call for the satire SWSP period. <br />[12] Out-of-priority depletion equals the fraction of the total site depletion that occurred whet theta was a cell on the South Platte River, equal to [10] ([11] / # of days in month). <br />[13] RMCCs Fulton fibre deliveries at RMCC's Erger Lateral or Brighton's Midland or 124th Ave augmentation stations, as reported by RMCC or Brighton. <br />[14] Fulton Ditch historical consumptive use (HCU) replacement credit from RMCC's 70 shares, equal to the lesser of 1.76 aF0/shardyear average historical consumptive use distributed monthly (based upon the SACWSD <br />change case engineering report for Case No 2001CW258), and the total Fulton Ditch Deliveries, [13], multiplied by the consumptive use factors presented in RMCCs SWSP renewal request (Apr -0281, May=0.687, <br />Jun 0.758, Jul.-0.786, Aug -.764, Sep-0.688, Oct4.465, based upon the engineering report for Case No 2001CW258). <br />[15] Total replacement requirement is the total of the out-of-priority depletion and the Fulton Ditch return flow obligation, equal to [15] - [17] if [17] is negative, otherwise equal to [15]. <br />[16] Fulton HCU credits delivered directly to the river. <br />[17] Required release of stored Fulton Ditch credits (or water pumped to storage during free river) to South Platte River in order to replace tie given month's depletion, equal to (15] - [16] if there is water in storage, Col [21). <br />[18] Stored Felton Ditch credits (or water pumped to storage during free river) released to South Plane River in order to replace depletions. Projcetlom calculated as the minimum oldie release requirement (equal to previous [ <br />+[17D and RMCCs previous BOM storage given in Col [21]. <br />[19] Surplus Fulton credits available far diversion to storage based en Fulton Ditch credits, [141 in excess of the out-of- priority depletions, [12]. <br />[20] Brighton lease repent equals [15] - [16] 418]. <br />[21] 'MCC' storage it Brighton's Kenneth Mitchell Lake 1. Equal to previous month% storage minus estimated evaporation and aug release plus surplus Fulton Credit. <br />[22] Remaining operations replacement requirement equals previous [22] + [15] - [16] - [18] - [20]. <br />ataeaaI ma+a our <br />
The URL can be used to link to this page
Your browser does not support the video tag.