My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-09_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-08-09_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:42 PM
Creation date
8/10/2011 2:02:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/9/2011
Doc Name
Mine Plan Map 23B
From
Colowyo Coal Company
To
DRMS
Type & Sequence
PR3
Email Name
MLT
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C1; <br />FACILITIESi <br />AREA <br />�� l� � , ;� �i # - �FfAC 9i3 r •,- �, ' - -... i j �% j - � j - -t„ '_�i i i i r ; �+ f�' <br />ra <br />0 . N 345 <br />p �\OC• <br />O ee <br />M m <br />1 <br />LEGENDCoordinates inNAD27 Colorado NorthZone,USFoot ENGINEER'S CERTIFICATION MINE PLAN <br />33 34 35 36 31 32 33 34 35 36 1, THOMAS C. PETERSON, being a <br />N 9 10 11 7 g TAN Licensed Professional Engineer in Collom Area <br />PERMIT BOUNDARY 10 11 12 T4N the State of Colorado, do hereby <br />16 15 14 13 16 15 14 Certify that this map has been <br />SECTION LINE reviewed by me and is true and <br />21 22 24 19 20 21 2 2 24 correct to the best of my knowledge SCALE: 1" = 500' <br />FUTURE PIT MINING LIMITS - BY YEAR and information relying on work DATE: 5119108 <br />28 26 25 30 29 28 g performed by others and based on O DRWG. BK TCP- RWF1ES1 <br />W C 25 information supplied by experts <br />C identified in section 2.03.3 of the Colowyo Coal Company APPROVED BY. <br />TIE -IN BOUNDARY FOR POST MINING TOPOGRAPHY 33 34 35 36 31 32 33 4 35 36 Colowyo Coal Company L.P. Permit. 5731 State Highway 13 <br />1 T4N <br />Meeker, Colorado 81641 DRWG NO. <br />IF�r MAP 23B <br />BASE OF COLLOM LITE PIT 4 3 2 1 6 5 4 3 1 79N <br />9 10 71 12 8 9 10 1 12 op�POO� FrC��s,': <br />BASE OF LITTLE COLLOM X COAL PIT S 16 5 14 a n 76 15 1 13 3 -*,f, F�a�; o 0 <br />500' 0 500' 1000' OFF TCO. p 32257 =: = Na REVISION DATE BY CHK <br />to B Co <br />21 22 23 24 9 20 21 22 23 24 i B14%/ <br />TEMPORARY SPOIL PILE AREA <br />0,,e••• ��F 0 PR -3 Modified Little Collom X Pit 3123111 TCP KRB <br />28 27 -_ I •••••••• <br />CONTOUR INTERVAL 25 FT. 26 25 30 ,g„ ° 27 26 25 �i sS NG O <br />Premine Topo 1. ���I,, l N L _ Revised Tie -In Boundary for Postminin? Topography. <br />'- PR -3 Revised Collom Temporary Fill Stockpl e. <br />33 34 35 36 37 32 33 34 35 36 Modified pit limit polygons based on model. 5113177 TCP KRB <br />r3N THOMAS C PETERSON <br />3 P.E. No. 32257 <br />5�¢l // PR -3 Added Little Collom Sump 8104111 TCP KRB <br />DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.