Laserfiche WebLink
• <br />• <br />• <br />RULE 3 - PERFORMANCE BOND <br />RULE 3 PERFORMANCE BOND <br />The performance bond calculations for the Colowyo existing permit area are included in Exhibit 13 and <br />the reclamation bond costs for the Collom mining area will be included in Exhibit 13B of the existing <br />permit document upon completion of the permit revision. Once complete, Bond Calculation Maps <br />showing the Worst Case Topography and Regraded Topography will be included as Map 35B and Map <br />36B, respectively. Bond Calculation Cross Sections will be provided on Map 40B. <br />Collom — Rule 3, Page 1 <br />Revision Date: 8/5/11 <br />Revision No.: PR -03 <br />