Laserfiche WebLink
Exhibit Table of Contents <br />Table of Contents <br />Exhibit <br />Exhibit 6.5 — Geotechnical Stability Exhibit <br />Attachments <br />a. Attachment 6.5.1— <br />b. <br />c. <br />d. <br />e. Attachment 6.5.5 — <br />Figures <br />a. <br />b. <br />c. <br />d. <br />Attachment 6.5.2 — <br />Attachment 6.5.3 — <br />Attachment 6.5.4 — <br />Figure 6.5.1 <br />Figure 6.5.2 <br />Figure 6.5.3 <br />Figure 6.5.4 <br />Exhibit 6.5 — <br />Geotechnical Stability Exhibit <br />— May Day No. 1 Boring Locations <br />— Incas Access Road Boring Locations <br />— Access Road Boring and Test Pit Location <br />— Augmentation Pond Boring Locations <br />Wildcat Mining Corporation <br />May Day Idaho Mine Complex — 112d Permit Application <br />August, 2011 <br />Exhibit Table of Contents <br />Letter from Dr. Gonzales Regarding Mayday No. 1 Geological <br />Setting <br />Mayday No. 1 Mill and Portal Geotechnical Stability Assessment <br />Geotechnical Reconnaissance- Mine Access Road <br />Analysis of the Effect of Blasting Operations on Structures <br />Associated with Mining Activity at the Mayday Mine <br />