LITTLE COLLOM POND - PLAN VIEW N
<br />Scale 1" = 50' W E
<br />S
<br />HOR >" =100'
<br />INERT 1" =50'
<br />EMBANKMENT CREST
<br />15:d EL 6649.0
<br />EMERGENCY SPILL WAY
<br />EL 6642.0
<br />SETTLEMENT W'v -KWAYW 42° HANDRAILS AS SPECIFIED
<br />MONITORING PRINCIPAL SPILLWAY WITH NCRS AN77- VORTEX TRASH RACK
<br />POINT II,, �EL. 664 1. 0 AND 30" RISER BARREL.
<br />RIPRAP PROTEC77ON AND INSTALL & PLACE I PERFORATIONS PER ELEVATION AS SPECIFIED
<br />18" PARSHALL FLUME AS SPECIFIED 3 SEE TABLE BELOW
<br />BYFIELD ENGINEER 2 STAFF GAGE 18" WATERMAN C-20 SLIDING GATE VALVE, EL INVERT 6626.10
<br />7 NORMAL POOL
<br />EL. 6630.0
<br />/ L 18'0 GALV STEEL CMP, 14 GAUGE MINIMUM,
<br />2-213'X 112° HELICALLY CORRUGATED, POLYMER COATED
<br />AT2.0 %SLOPE
<br />FABRIC WRAPPED FILTER, TRANSPORT AND PLACE:
<br />120 CUBIC YARDS OF CLEAN, OPEN - GRADED GRAVEL (MINUS 2 INCH) APPROX 1.0
<br />TO 1.2 FEET THICK, 60 FEET IN LENGTH & EXTENDING ACROSS THE ENTIRE FOOTPRINT
<br />OF THE LOWER ONE -THIRD OF DOWNSTREAM TOE BELOW ELEV 7468. FILTER FABRIC
<br />SHALL BE MIRAFI 14ON NON -WOVEN OR EQUIVALENT, AND SHALL COMPLETELY
<br />SURROUND THE GRAVEL IN ALL DIMENSIONS. ALL FABRIC EDGES SHALL BE PROVIDED
<br />WITH 3 FEET OF OVERLAP WITH ADJACENT EDGE.
<br />Site Preparation:
<br />Prior to placing fill, the area shall be stripped of organic topsoil or other deleterious materials.
<br />6 Fr (MIN) EL 0625.0 — POND BOTTOM
<br />20 FT CENTERS EL. 6623.0
<br />a FT WIDE (MIN) KFYWAY6 FT (MIN) IN DEPTH WITH 1H_-IV SIDES
<br />EXTENDING ACROSS ENTIRE ABUTMENT
<br />EMBANKMENT DETAILS
<br />Scale 1" = 29
<br />Acceptable Fill Materals:
<br />Suitable fill materials can be obtained from pond excavations or from nearby borrow sources. Suitable materials include native clay soils, clayey sand soils,
<br />and bedrock materials which are broken down to these soil types ISM, SC, GM, GC and CL). Bedrock materials shall be proocessed to produce a soil like
<br />material with maximum particle size of 6 inches. The materials used as embankment fill shall have at least 25 percent fines ('material finer than No. 200 sieve).
<br />The field engineer may approve the use of other materials following appropriate laboratory testing.
<br />Unacceptable Fill Materials:
<br />Materials not considered suitable for use as embankment fill include high plasticity clay, silts and c leaner sand and gravel (CH, ML, SP, S VV GP and GIA9.
<br />Also unacceptable are highly carbonaceous materials obtained from bedrock excavations or well - cemented sandstones which do not break down to soil like material.
<br />Highly organic soils or materials containing construction debits are also not acceptable. Frozen soil and mine processing waste are not acceptable.
<br />Fill Placement and Compaction:
<br />Embankment fill shall be placed in thin horizontal lifts Is to 12 inches loose thickness). The fill shall be moisture conditioned as required to achieve a moisture
<br />content between -3 to +2 percent of optimum moisture content and compacted to at least 95 percent of standard proctor maximum dry density (ASTM D 698).
<br />The placing and spreading of fill materials shall be started at the lowest point of the embankment. Fill placement and compaction shall be observed and tested by
<br />qualified geotechnical engineering firm.
<br />Monitoring and Inspections:
<br />Monitoring and inspections shall be performed by qualified individuals as outlined in Colorado DRMS regulations. Once monitoring point shall be set at the crest of the
<br />embankment approximately over the outlet works or as otherwise directed by the inspector. The northing, easting, and elevation of the monitorpoint shall be measured
<br />at completion of construction and thereafter at approximately 3 month intervals for one year.
<br />Construction Notes:
<br />1. The field engineer shall adjust the dimensions and elevations in the field to ensure that the total) capacity is less than 20
<br />acre -feet and the embankment height is less that 20.0 feet per MSHA procedures.
<br />2. Hatched area of the spillway and outlet section shall be riprapped with 18 inch median
<br />size material.
<br />3. Hatched area of the outlet of the Lower Clean Water diversion shall be riprapped with 200 cubic yards of 24 inch median
<br />size material.
<br />AREA - CAPACITY TABLE
<br />ELEVATION
<br />A 6700
<br />8700 A,
<br />CAPACITY
<br />INCREMENTAL
<br />6680
<br />6660
<br />(Acres)
<br />(Acres)
<br />(Acre -Feet)
<br />PILLWAV
<br />6621
<br />0.13
<br />6660
<br />30 6660
<br />0
<br />OP OF DAM
<br />6640
<br />6640
<br />0.570
<br />6620
<br />6620
<br />0.403
<br />6600
<br />1 1 6600
<br />6630
<br />0.65
<br />0 +00
<br />1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7+00
<br />2.582
<br />B
<br />0.927
<br />QI
<br />6650
<br />6635
<br />1.21
<br />6650 Q
<br />6640
<br />6630
<br />7.215
<br />1.605
<br />6640
<br />2.00
<br />8.026
<br />15.241
<br />6640
<br />6630
<br />/
<br />6642
<br />2.61
<br />4.611
<br />19.852
<br />TOTAL CAPACITY 19.85 ACRE -FEET (DESIGN)
<br />6620
<br />6620
<br />6610 �—
<br />6610
<br />6600
<br />6600
<br />0 +00 1 +00
<br />2 +00 3 +00
<br />4 +00 5 +00 6 +00 7 +00 8 +00 9 +00 10 +00
<br />11 +00
<br />HOR >" =100'
<br />INERT 1" =50'
<br />EMBANKMENT CREST
<br />15:d EL 6649.0
<br />EMERGENCY SPILL WAY
<br />EL 6642.0
<br />SETTLEMENT W'v -KWAYW 42° HANDRAILS AS SPECIFIED
<br />MONITORING PRINCIPAL SPILLWAY WITH NCRS AN77- VORTEX TRASH RACK
<br />POINT II,, �EL. 664 1. 0 AND 30" RISER BARREL.
<br />RIPRAP PROTEC77ON AND INSTALL & PLACE I PERFORATIONS PER ELEVATION AS SPECIFIED
<br />18" PARSHALL FLUME AS SPECIFIED 3 SEE TABLE BELOW
<br />BYFIELD ENGINEER 2 STAFF GAGE 18" WATERMAN C-20 SLIDING GATE VALVE, EL INVERT 6626.10
<br />7 NORMAL POOL
<br />EL. 6630.0
<br />/ L 18'0 GALV STEEL CMP, 14 GAUGE MINIMUM,
<br />2-213'X 112° HELICALLY CORRUGATED, POLYMER COATED
<br />AT2.0 %SLOPE
<br />FABRIC WRAPPED FILTER, TRANSPORT AND PLACE:
<br />120 CUBIC YARDS OF CLEAN, OPEN - GRADED GRAVEL (MINUS 2 INCH) APPROX 1.0
<br />TO 1.2 FEET THICK, 60 FEET IN LENGTH & EXTENDING ACROSS THE ENTIRE FOOTPRINT
<br />OF THE LOWER ONE -THIRD OF DOWNSTREAM TOE BELOW ELEV 7468. FILTER FABRIC
<br />SHALL BE MIRAFI 14ON NON -WOVEN OR EQUIVALENT, AND SHALL COMPLETELY
<br />SURROUND THE GRAVEL IN ALL DIMENSIONS. ALL FABRIC EDGES SHALL BE PROVIDED
<br />WITH 3 FEET OF OVERLAP WITH ADJACENT EDGE.
<br />Site Preparation:
<br />Prior to placing fill, the area shall be stripped of organic topsoil or other deleterious materials.
<br />6 Fr (MIN) EL 0625.0 — POND BOTTOM
<br />20 FT CENTERS EL. 6623.0
<br />a FT WIDE (MIN) KFYWAY6 FT (MIN) IN DEPTH WITH 1H_-IV SIDES
<br />EXTENDING ACROSS ENTIRE ABUTMENT
<br />EMBANKMENT DETAILS
<br />Scale 1" = 29
<br />Acceptable Fill Materals:
<br />Suitable fill materials can be obtained from pond excavations or from nearby borrow sources. Suitable materials include native clay soils, clayey sand soils,
<br />and bedrock materials which are broken down to these soil types ISM, SC, GM, GC and CL). Bedrock materials shall be proocessed to produce a soil like
<br />material with maximum particle size of 6 inches. The materials used as embankment fill shall have at least 25 percent fines ('material finer than No. 200 sieve).
<br />The field engineer may approve the use of other materials following appropriate laboratory testing.
<br />Unacceptable Fill Materials:
<br />Materials not considered suitable for use as embankment fill include high plasticity clay, silts and c leaner sand and gravel (CH, ML, SP, S VV GP and GIA9.
<br />Also unacceptable are highly carbonaceous materials obtained from bedrock excavations or well - cemented sandstones which do not break down to soil like material.
<br />Highly organic soils or materials containing construction debits are also not acceptable. Frozen soil and mine processing waste are not acceptable.
<br />Fill Placement and Compaction:
<br />Embankment fill shall be placed in thin horizontal lifts Is to 12 inches loose thickness). The fill shall be moisture conditioned as required to achieve a moisture
<br />content between -3 to +2 percent of optimum moisture content and compacted to at least 95 percent of standard proctor maximum dry density (ASTM D 698).
<br />The placing and spreading of fill materials shall be started at the lowest point of the embankment. Fill placement and compaction shall be observed and tested by
<br />qualified geotechnical engineering firm.
<br />Monitoring and Inspections:
<br />Monitoring and inspections shall be performed by qualified individuals as outlined in Colorado DRMS regulations. Once monitoring point shall be set at the crest of the
<br />embankment approximately over the outlet works or as otherwise directed by the inspector. The northing, easting, and elevation of the monitorpoint shall be measured
<br />at completion of construction and thereafter at approximately 3 month intervals for one year.
<br />Construction Notes:
<br />1. The field engineer shall adjust the dimensions and elevations in the field to ensure that the total) capacity is less than 20
<br />acre -feet and the embankment height is less that 20.0 feet per MSHA procedures.
<br />2. Hatched area of the spillway and outlet section shall be riprapped with 18 inch median
<br />size material.
<br />3. Hatched area of the outlet of the Lower Clean Water diversion shall be riprapped with 200 cubic yards of 24 inch median
<br />size material.
<br />AREA - CAPACITY TABLE
<br />ELEVATION
<br />AREA
<br />AVERAGEAREA
<br />CAPACITY
<br />INCREMENTAL
<br />CUMULATIVE
<br />(Feet)
<br />(Acres)
<br />(Acres)
<br />(Acre -Feet)
<br />(Acre -Feet)
<br />6621
<br />0.13
<br />6639
<br />0
<br />0
<br />0.142
<br />6625
<br />0.16
<br />0.570
<br />0.570
<br />0.403
<br />6630
<br />0.65
<br />2.013
<br />2.582
<br />0.927
<br />6635
<br />1.21
<br />4.633
<br />7.215
<br />1.605
<br />6640
<br />2.00
<br />8.026
<br />15.241
<br />2.305
<br />6642
<br />2.61
<br />4.611
<br />19.852
<br />TOTAL CAPACITY 19.85 ACRE -FEET (DESIGN)
<br />PERFORATIONS
<br />Elevation of
<br />Perforations (ft)
<br />Diameter of
<br />Perforations (in)
<br />Number of
<br />Perforations per
<br />Elevation
<br />6630
<br />1
<br />4
<br />6631
<br />1
<br />4
<br />6638
<br />2
<br />4
<br />6639
<br />2
<br />4
<br />ENGINEERS CERTIFICATION
<br />I, THOMAS C. PETERSON, being a
<br />Licensed Professional Engineer in
<br />the State of Colorado, do hereby
<br />certify that this map has been
<br />reviewed by me and that it accurately
<br />represents the proposed impoundment
<br />I _ p 0 L
<br />O l�qS C • PFrF9 ?�.
<br />32257
<br />moo': 1914/o •r ��
<br />��O . ns ` S f 0 N d I•• F-� G. O `�
<br />No 32257
<br />P.E. 04i if
<br />DATE
<br />-, X11
<br />"N
<br />o`" o�p&n9 " °d5
<br />
|