Laserfiche WebLink
R Squared Incorporated <br />5555 DTC Parkway Suite 4000 -A <br />Greenwood Village CO, 80111 <br />Project: Wildcat Mining Corp <br />Project Name / Number: Mayday Idaho <br />Project Manager: George Robinson <br />Reported: <br />06/03/11 15:10 <br />Analyte <br />Result <br />Reporting Spike Source %REC RPD <br />Limit Units Level Result %REC Limits RPD Limit Notes <br />Batch B106013 - General Prep - Wet Chem <br />LCS Dup (B106013 -BSD1) <br />Chloride <br />Batch B106017 - General Prep - Wet Chem <br />Blank (B106017 -BLK1) <br />Alkalinity, Total <br />LCS (B106017 -BS1) <br />Alkalinity, Total 99.0 10.0 mg/L 100 99.0 80 -120 <br />Prepared & Analyzed: 05/24/11 <br />LCS Dup (B106017 -BSD1) <br />Alkalinity, Total 98.0 10.0 mg/L 100 98.0 80 -120 1.02 20 <br />• <br />Analytical <br />Laboratories <br />Green Analytical Laboratories <br />- ,JB/L 1 "4‘dtik - <br />Debbie Zufelt, Reports Manager <br />dzufelt @greenanalytical.com p: 970.247.4220 f: 970.247.4227 75 Suttle Street Durango, CO 81303 <br />General Chemistry - Quality Control <br />103 10.0 mg/L 100 103 85 -115 1.96 20 <br />ND 10.0 mg/L <br />Prepared & Analyzed: 05/24/11 <br />Prepared & Analyzed: 05/24/11 <br />Prepared & Analyzed: 05/24/11 <br />The results in this report apply to the samples analyzed in accordance with the chain of <br />custody document. This analytical report must be reproduced in its entirety. <br />I Page 19 of 26 <br />