My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-09_REVISION - M1981185 (59)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-08-09_REVISION - M1981185 (59)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:16 PM
Creation date
8/10/2011 11:16:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
8/9/2011
Doc Name
CN-01 112d permit application Exhibit U Attachemnt U-4 part 1
From
Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule 6.4.21.11(b) <br />R 2 INCORPORATED <br />ENVIRONMENTAL AND ENGINEERING SERVICES <br />STRATEGICALLY POSITIONED- TECHNICALLY PREPARED <br />MAY DAY IDAHO MINE SITE <br />WILDCAT MINING CORPORATION <br />ORIGINAL 112d PERMIT APPLICATION, <br />EXHIBIT U - <br />Water Quality <br />Rule 3.1.6, 6.4.7 and 6.4.21 <br />1.0 Description of Surface Water Bodies and Sampling Locations <br />GEORGE M.L. ROBINSON,P.G. <br />Wildcat Mining Corporation <br />May Day Idaho Mine Complex — 112d Permit Application <br />5555 DTC Parkway Suite A -4000, Greenwood Village, Colorado 80111 <br />Phone: (303) 832 -7664 I Fax: (303) 832 -7469 <br />Revised: August, 2011 <br />J. ERICH RAUBER,P.E. <br />Requires the collection of 5 consecutive quarterly sampling events. At the time of this report, <br />five - quarters of data have been collected: <br />• First Quarterly Event: May 19 -20, 2010 (2nd Quarter, 2010); <br />• Second Quarterly Event: August 8, 2010 (3rd Quarter, 2010); <br />• Third Quarterly Event November 15, 2010 (4th Quarter, 2010); <br />• Fourth Quarterly Event February 15, 2011 (1st Quarter, 2011); and <br />• Fifth Quarterly Event May, 2011 (2nd Quarter, 2011). <br />The analyzed analytes are presented in Table U -4 -1. After four quarters of sampling and <br />analysis, the following changes in the laboratory analysis were adopted on April 1, 2011, per <br />DRMS request: <br />• Added dissolved aluminum (Al), and iron (Fe); <br />• Added to total recoverable analyte list: <br />o Molybdenum (Mo); <br />o Cyanide -CN (WAD); and <br />o Total organic carbon (TOC); <br />• Switch from dissolved to total recoverable: Barium (Ba), Beryllium (Be), and Boron <br />(B). <br />Six locations have been designated for the collection of surface water samples as shown on <br />Exhibit U, Attachment U -4, Figure G -1. At each location the following -data collection activities <br />were undertaken: <br />
The URL can be used to link to this page
Your browser does not support the video tag.