My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-09_REVISION - M1981185 (56)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-08-09_REVISION - M1981185 (56)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:15 PM
Creation date
8/10/2011 9:14:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
8/9/2011
Doc Name
CN-01 112d permit application Exhibit G thru H
From
Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 14 <br />SOP NUMBER 0.0 Monitor Well Groundwater Sampling <br />1.0 PURPOSE AND SCOPE <br />The purpose of this document is to define the standard operating 'procedure (SOP) for collecting <br />groundwater samples from wells for the Wildcat Mining Corporation Mine discharge permits. <br />This procedure gives descriptions of equipment, field procedures, and quality assurance /quality <br />control (QA/QC) procedures necessary to collect groundwater samples from wells using a bailer <br />and /or submersible pump and use of low stress (low purging) procedures. <br />2.0 RESPONSIBILITIES AND QUALIFICATIONS <br />The Project Manager of Field Manager have the overall responsibility for implementing this <br />SOP. They will be responsible for assigning appropriate environmental staff to implement this <br />SOP and for ensuring that procedures are followed by all personnel. <br />All personnel performing these procedures are required to have the appropriate health and safety <br />training. In addition, all personnel are regiiirecl to have a complete understanding of the <br />procedures described within this SOP and receive specific training regarding these procedures, if <br />necessary. <br />All environmental and assay laboratory staff are responsible for documenting deviations from <br />this SOP and reporting them to the Project Manager or Field Manager. <br />3.0 RELATED STANDARD OPERATING PROCEDURES <br />The procedures set forth in this SOP are intended for use with the following SOPs: <br />SOP No. x* Water Level Measurements <br />SOP No. ** Field Filtration Procedures <br />SOP No. ** Decontamination of Sampling Equipment <br />SOP No. x* Field Parameter Measurements (including Instrument Calibration) <br />SOP No. xk Sample Management <br />SOP No. ** Surveying (Land and GPS) <br />4.0 PROCEDURES FOR GROUNDWATER SAMPLING <br />Procedures for groundwater sampling from a monitoring well are designed to obtain a sample <br />that is representative of the formation water. Because an estimate of the quality of formation <br />water is desired, standing water within the well must be evacuated before sampling. Also, a <br />measure of the static water elevations is important to determine if horizontal and vertical flow <br />gradients change during site characterization activities. <br />0 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.