My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-09_REVISION - M1981185 (56)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-08-09_REVISION - M1981185 (56)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:15 PM
Creation date
8/10/2011 9:14:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
8/9/2011
Doc Name
CN-01 112d permit application Exhibit G thru H
From
Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Proceed to bail or pump one casing volume of water from the well; take field <br />parameter measurements when one casing volume has been 'removed. <br />6. When using a pump without volume control, pump water into a container of <br />known volume to estimate when one casing volume has been removed. Use <br />Teflon bailer to take sample for field parameter measurement. <br />7. Remove a minimum of three casing volumes of water from the well. Test for the <br />field parameters as each successive casing volume is removed. <br />8. Cease the purging operation when the field parameters are approximately the <br />same for two successive casing volumes, or when ten casing volumes of water <br />have been removed. <br />8. QUALITY ASSURANCE /QUALITY CONTROL <br />9. INSTRUMENT CALIBRATION AND STANDARDIZATION <br />10. DATA ANALYSIS AND CALCULTIONS <br />11. DATA AND RECORDS MANAGEMENT <br />12. DOCUMENTATION <br />13. REFERENCES <br />EPA, March 2001, Guidance for Preparing Standard Operating Procedures <br />(SOPs) EPA QA/G -6, EPA /240/B- 02/004, Office of Environmental Information, <br />Washington, D.C. <br />EPA, March 2001, EPA Requirements for Quality Management Plans, EPA A/R- <br />2, EPA/240B- 02/002, Office of Environmental Information, Washington, D.C. <br />EPA, Nov ember, 2002, Guidance on Environmental Verification and Data <br />Validation, EPA QA/G -8, EPA /240/R- 02/004, Office of Environmental Information, <br />Washington, D.C. <br />EPA, December 2002, Guidance for Quality Assurance Project Plans, EPA AQ/G - 5, <br />EPA/240 /R- 2/009, Office of Environmental Information, Washington, D.C. <br />Wildcat Mining Corporation <br />R Squared33 SOP - Purging High Producing- gmlr.doc <br />3 <br />6/10/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.