My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-09_REVISION - M1981185 (56)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-08-09_REVISION - M1981185 (56)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:15 PM
Creation date
8/10/2011 9:14:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
8/9/2011
Doc Name
CN-01 112d permit application Exhibit G thru H
From
Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 6 <br />SOP NUMBER 0.0 Well Development <br />1.0 PURPOSE AND SCOPE <br />This Standard Operating Procedure (SOP) provides teclmical guidance and methods that will <br />be used and procedures to be followed for developing groundwater monitoring wells. This <br />SOP gives descriptions of equipment, field development procedures, field data collection, <br />and personnel responsibilities. <br />The purpose of well development is to restore the hydraulic conductivity of the aquifer material <br />surrounding the well to near pre -well installation conditions. This is accomplished by removing <br />well drilling fluids, solids, or other particulates that may have been introduced or deposited on <br />the borehole wall during drilling and well constriction activities. Properly developed <br />monitoring wells allow for the collection of representative groundwater samples. <br />2.0 RESPONSIBILITIES AND QUALIFICATIONS <br />The Project Manager or Field Manager have the overall responsibility for implementing this <br />SOP. They will be responsible for assigning appropriate environmental staff to implement <br />this SOP and for ensuring that the procedures are followed. <br />All personnel performing these procedures are required to have the appropriate health and <br />safety training. In addition, all personnel are required to have a complete understanding of <br />the procedures described within this SOP, and receive specific training regarding these <br />procedures, if necessary. <br />All envi oninental staff and assay laboratory staff are responsible for reporting deviations <br />from this SOP to the Project Manager or Field Manager. <br />3.0 RELATED STANDARD OPERATING PROCEDURES <br />The procedures set forth in this SOP are intended for use with the following SOPs: <br />SOP No. ** Groundwater Sampling <br />SOP No. ** Monitoring Well Water -Level Measurement <br />SOP No. ** Decontamination of Sampling Equipment <br />SOP No. ** Field Parameter Measurements (including Instrument Calibration) <br />SOP No. ** Monitoring Well Installation <br />4.0 EQUIPMENT LIST <br />The following items will be required to develop groundwater monitoring wells: <br />• Well completion logs <br />• Well development records (see Attachment A) <br />o Well keys <br />• Stainless steel, adjustable rate, submersible pump, controller, and power source (generator <br />or battery) <br />0 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.