Laserfiche WebLink
ORS <br />Sump 111E <br />Tank <br />24" Short Head <br />Cone Crusher <br />4x5 Ball Mill <br />CRUSHING & <br />GRINDING <br />sr <br />4 J <br />24x48 Double Deck Screen <br />i <br />DSM Screen <br />Sand <br />Pump <br />Schematic diagram of the mineral processing plant at the May Day Idaho millsite. <br />The material flow on this diagram is generally from top to bottom. The four primary processes <br />of Crushing and Grinding. Size Classification, Gravity Classification, and Flotation are separated <br />by column from left to right. The actual material flow is somewhat more complex than shown here. <br />WILDCAT MINING CORPORATION <br />LOCATED IN SECTION 21 AND SECTION 2B <br />T. 36 N., R. 11 W., N.M.P.M. <br />LA PLATA COUNTY, STATE OF COLORADO <br />GRAVITY <br />CLASSIFICATION <br />12x12 <br />Simplex <br />Jig <br />woe •wrn <br />8x12 Duplex Jig <br />(AV <br />AaV <br />SO gPn <br />Underflow to Flotatia <br />Gold Concentrate <br />to Cleanup <br />2.5' Vertical Pump <br />10,000 GALLON <br />WATER <br />STORAGE <br />woe woe <br />2x3 - Cell <br />Denver Flotation <br />4 -Cell <br />Cleaner Flotation <br />c <br />Concentrate <br />FLOTATION <br />CONCENTRATION <br />woe <br />2 Deck <br />d�`1 \\\\\\` Tab e g <br />30 gpm <br />woe woe— <br />® Water <br />Cake <br />Stored <br />Underground <br />Sump Sand <br />Tank Pump <br />WILDCAT MINING CORPORATION <br />5555 DTC PARKWAY <br />SUITE A -4000 <br />GREENWOOD VILLAGE, CO 9011 1 <br />SCHEMATIC DIAGRAM OF THE <br />MINERAL PROCESSING PLANT <br />AT THE IDAHO MILL SITE <br />PREPARED BY: JBC <br />REVIEWED BY DJM <br />REVISION DATE: ❑B 1 <br />FIGURE D -11„ <br />