Laserfiche WebLink
July 27, 2011 <br />We drove by the Bear Creek fan site. The site appears clean and well maintained. Mr. Kiger said this site is being <br />considered for an electricity generation plant powered by methane. <br />SIGNS AND MARKERS 4.02: <br />The mine ID sign was in place at the main entrance at the train Loadout. A topsoil sign was properly displayed at <br />the GVB- 17 -02B site. <br />DOCUMENTS RECEIVED: None <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br />C -1981- 022 /Elk Creek Mine BFB <br />Page 3 of 6 <br />