Laserfiche WebLink
Robinson Lake Operating Plan Climax Molybdenum Company <br />Version: R1 Permit M -1977 -493 <br />1.0 OVERVIEW 1 <br />2.0 BASIS AND ASSUMPTIONS 1 <br />2.1 Probable Maximum Precipitation 1 <br />2.2 100 -Year Snowmelt 1 <br />2.3 Seepwater Inflow 1 <br />2.4 Operating Return Flows 1 <br />2.5 Robinson Lake Surcharge Storage Capacity 2 <br />3.0 NORMAL OPERATING CONDITIONS 2 <br />4.0 PMP EVENT CONDITIONS 3 <br />5.0 OPERATING CRITERIA 3 <br />6.0 FACILITY MONITORING AND CONTROL SYSTEMS 4 <br />6.1 Robinson Lake 4 <br />6.2 Robinson Lake Pump Station 4 <br />6.3 Robinson Dam 4 <br />6.4 Robinson Lake Seepage Pump System 5 <br />6.5 4 Dam Seepage Collection and Pump System 5 <br />7.0 CONTINGENCY PLAN 5 <br />• 8.0 REPORTING 6 <br />• <br />Figure 1 — Normal Drainage Basin Map <br />Figure 2 — PMP Drainage Basin Map <br />EPP — Appendix D <br />TABLE OF CONTENTS <br />LIST OF FIGURES <br />August 2011 <br />