Laserfiche WebLink
• <br />• <br />• <br />Water Quality Monitoring Plan Climax Molybdenum Company <br />Version: R1 Permit No. M- 1977 -493 <br />7.0 REFERENCES <br />Climax Molybdenum Company (1984) Seismic work along Tenmile Creek at the northeast end <br />of Wheeler Flats. Interoffice Memo, 1984. Freeze, R. Allan, Cherry, John A. (1979) <br />Groundwater. Prentice Hall, Inc., Upper Saddle River, NJ. 604pp. <br />Gibbons R.D. (1994) Statistical Methods for Ground -Water Monitoring. John Wiley & Sons, New <br />York. 1994 1st ed, 2009 2nd ed. <br />Kumar & Associates (1993) Geotechnical Engineering Study — Proposed Robinson Lake <br />Seepage Collection System. Eagle Park Reservoir Project, Climax, CO. Prepared for <br />Cyprus Climax Metals Company. 1993. <br />Kumar & Associates (1994) Geotechnical Engineering Study — Proposed Proposed Process <br />Water Collection and Impoundment Reservoir Downstream of Robinson Tailing Pond <br />and Dam No. 1. Eagle Park Reservoir Project, Climax, CO. Prepared for Cyprus Climax <br />Metals Company. 1994. <br />Titan Environmental Corporation (1994) Shaft 5 Pump Station Hydrogeologic Evaluation. <br />Prepared for Cyprus Climax Metals Company. September, 1994. <br />U.S. Environmental Protection Agency (2006) Data Quality Assessment: Statistical Methods for <br />Practitioners: EPA QA/G -9S, EPA/240 /B- 06/003. <br />EPP — Appendix C <br />August, 2011 26 <br />