Laserfiche WebLink
• <br />• <br />• <br />Technical Revision (TR -18) Climax Molybdenum Company <br />Environmental Protection Plan Permit No. M -1977 -493 <br />Table of Contents <br />T -1 Introduction 1 <br />T -1.1 Purpose and Objectives 1 <br />T -1.1.1 Reference and Indexing 1 <br />T -1.1.2 Changes in Referenced Information and Documents 1 <br />T -1.1.3 Emergency Response Plan for Designated Chemicals 2 <br />T -1.2 Description of Site 2 <br />T -2 Other Agency Environmental Protection Measures 3 <br />T -2.1 General Information 3 <br />T -2.2 Specific Permits and Authorizations 4 <br />T -3 Designated Chemicals 5 <br />T -3.1 List of Chemicals and Specific Locations 6 <br />T -3.2 Designated Chemicals Information 7 <br />T -3.2.1 Collector 7 <br />T -3.2.2 Frother 7 <br />T -3.2.3 Cleaner Frother 8 <br />T -3.2.4 Iron Depressant 8 <br />T -3.2.5 Iron and Copper Depressant 9 <br />T -3.2.6 Lead and Copper Depressant 9 <br />T -3.3 Water Treatment Chemicals Information 10 <br />T -3.3.1 Flocculant 10 <br />T -3.3.2 Lime (Calcium Oxide) 10 <br />T -3.3.3 Sulfuric Acid 10 <br />T -3.4 Material Safety Data Sheets for Designated Chemicals 11 <br />T -3.5 Disposal, Decommissioning, Detoxification or Stabilization 11 <br />T -3.5.1 Temporary Cessation /Prolonged Lack of Mineral Production 11 <br />T -3.5.2 Final Closure 11 <br />T -4 Acid - Forming Materials and Acid Mine Drainage 11 <br />T -4.1 Temporary Cessation /Prolonged Lack of Mineral Production 12 <br />T -4.2 Final Closure 12 <br />T -5 Climax Mine Environmental Protection Facilities 13 <br />T -5.1 Arkansas River Watershed 15 <br />T -5.1.1 Potential Sources of Contamination 15 <br />T -5.1.2 Environmental Protection Facilities 15 <br />T -5.2 Eagle River Watershed 16 <br />T -5.2.1 Potential Sources of Contamination 16 <br />T -5.2.2 Environmental Protection Facilities 17 <br />T -5.3 Tenmile Creek Watershed 21 <br />T -5.3.1 Potential Sources of Contamination 21 <br />T -5.3.2 Environmental Protection Facilities 23 <br />T -5.4 Environmental Protection Facility Effectiveness Evaluation 27 <br />T -5.4.1 Arkansas River Watershed 27 <br />T -5.4.2 Eagle River Watershed 27 <br />T -5.4.3 Tenmile Creek Watershed 28 <br />EPP Version: R1 <br />Climax Molybdenum Company <br />Permit M- 1977 -493 <br />Environmental Protection Plan <br />T -i July 2011 <br />