Laserfiche WebLink
Potential Area of <br />Impacts <br />Potential Contaminant <br />Sources <br />Direct (Governing) <br />EPF /Control <br />Internal Controls <br />Upper Arkansas <br />River Watershed <br />Impacted water from the flooded <br />underground workings <br />5 -Shaft Pump Station <br />Run -off and seepage from the <br />Storke Yard <br />Storke Wastewater Pump <br />Station <br />Run -off from road cuts and <br />overburden on Ceresco Ridge <br />above the Storke Yard <br />Storke Wastewater Pump <br />Station, Ceresco Seepage <br />Collection System <br />Upper Eagle River <br />Watershed <br />4 Dam Seepage <br />4 Dam Pump Station <br />Robinson Lake and Dam - <br />process water, seepage, <br />sediments <br />Robinson Lake Seepwater <br />Pump System, <br />Robinson Dam <br />Robinson TSF and 1 Dam- <br />tailing, seepwater, toe drain <br />discharge, Tenmile Tunnel <br />drainage <br />Robinson Lake Pump <br />Station, <br />1 Dam (Robinson TSF), <br />Tim's Pond, <br />Warren's Pump <br />System, Chalk <br />Mountain <br />Interceptor <br />Upper Tenmile <br />Creek Watershed <br />Designated chemicals for <br />concentrate production and <br />water treatment chemicals <br />EPFs for designated <br />chemicals and water <br />treatment chemicals, <br />Impacted water including: <br />process water, seepage, run -off, <br />underground mine water, and <br />water from TSFs <br />5 Dam Seepwater Pump <br />System, <br />ETDL, <br />Tenmile TSF, <br />Mayflower TSF <br />Process Water <br />Tank, Tenmile <br />Tunnel, 2 Dam <br />Spillway, East <br />Side Channel, <br />Tenmile Decant, <br />Sludge <br />Densification <br />Plant (SDP), 3 <br />Dam Pump <br />Station , East <br />Interceptor, West <br />Interceptor <br />Tailing stored in TSFs <br />TDL, <br />2 Dam, <br />3 Dam, <br />5 Dam <br />Acid - generating overburden <br />materials <br />Diversion structures to <br />prevent runon and to direct <br />impacted runoff to <br />treatment facilities, <br />collection drains beneath <br />and adjacent to OSFs <br />Material <br />segregation, <br />concurrent <br />reclamation <br />Technical Revision (TR -18) <br />Environmental Protection Plan <br />Climax Molybdenum Company <br />Permit No. M- 1977 -493 <br />Table T -3: Potential Contaminant Sources and Environmental Protection Facilities at the Climax <br />Mine <br />EPP: Revision R1 <br />T -14 <br />July 2011 <br />