Laserfiche WebLink
Machine <br />Description <br />Weight/unit <br />(Tons) <br />Ownership <br />Cost/hr /unit <br />Haul Rig <br />Cost/hr /unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr /fleet <br />Return Trip <br />Cost/hr /fleet <br />DOT permit <br />Cost/fleet <br />-Cat D8R Series II - 8SU (20 <br />52.55 <br />$39.08 <br />$125.45 <br />1 <br />$164.53 <br />$125.45 <br />$0.00 <br />-Reveg equipment <br />10.00 <br />$20.00 <br />$88.67 <br />1 <br />$108.67 <br />$88.67 <br />$0.00 <br />Subtotals : <br />$273.20 <br />$214.12 <br />$0.00 <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task # : 005 <br />Date : 08/02/2011 <br />User : KAP <br />Permit or other job action : New <br />Task description :Mobilization <br />EQUIPMENT TRANSPORT RIG COST <br />NON - ROADABLE EQUIPMENT <br />Cost Breakdown : <br />CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />State :Colorado <br />County :Archuleta <br />Site :Keyah Grande <br />Available rig capacities <br />Ownership cost/hour <br />Operating cost/hour : <br />Operator cost/hour : <br />Helper cost/hour : <br />Total Unit Cost/hour : <br />Permit/job # :M-2011-026 <br />Abbreviation :none <br />Filename :MO26-005 <br />Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on- highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />0 -25 Tons <br />$16.63 <br />$44.38 <br />$27.66 <br />$0.00 <br />$88.67 <br />26 -50 Tons <br />$18.37 <br />$46.13 <br />$27.66 <br />$25.39 <br />$117.55 <br />51+ Tons <br />$22.33 <br />$50.07 <br />$27.66 <br />$25.39 <br />$125.45 <br />sheet 1 of 2 <br />