Laserfiche WebLink
6. The determination of the financial warranty for this site is based on using a <br />specific pump, pumping rates and electrical costs. Please specify the type of <br />pump(s) which will be used to dewater Tract C. <br />The planned pump is a diesel operated 6 inch Goodwin pump with an output of <br />approximately 500± to 800± gallons /minute. <br />7. The Applicant has stated the cost to reclaim Tract C has been offset by <br />reclamation in Tract A. The Division has confirmed that costs associated <br />with grading Tract C have been offset by grading in Tract A. However, <br />dewatering, topsoil replacement and seeding costs will need to be added to <br />the current financial warranty amount of $286,979. Once all of the adequacy <br />issues have been addressed, the Division will recalculate the financial <br />warranty amount. <br />Understood. <br />ATTACHEMENTS: <br />• Proof of Placement — Weld County Clerk to the Board <br />• Technical Revision — Map revised. <br />• C.G.R.S. Hydrogeologic Evaluation Report of October 2007. <br />Varra Companies, Inc. - M- 2009 -006 <br />July 2011 Technical Revision 5 <br />Kurtz Resource Recovery & Land Development Project Correspondence of 3 August 2011 <br />