Laserfiche WebLink
Exhibit E — Reclamation Plan <br />(i) Final grading - specify maximum anticipated slope gradient or <br />expected ranges thereof; <br />(ii) Seeding - specify types, mixtures, quantities, and expected time(s) <br />of seeding and planting; <br />(iii) Fertilization - if applicable, specify types, mixtures, quantities and <br />time of application; <br />(iv) Revegetation - specify types of trees, shrubs, etc., quantities, size <br />and location; and <br />(v) Topsoiling - specify anticipated minimum depth or range of depths <br />for those areas where topsoil will be replaced. <br />The Amended lands will be reclaimed in a manner consistent with the original <br />permit, and as otherwise detailed under Exhibits D and L. <br />Varra Companies, Inc. Heintzelman Project — Conveyor Amendment 2 <br />OMLR Permit M2009 -018 August 2011 <br />