Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O la <br />02a <br />03a <br />04a <br />05a <br />06a <br />07a <br />Demolish and remove structures from the site <br />DEMOLISH <br />.-- N <br />10.00 <br />$14,043.47 <br />$15,544.23 <br />$668.00 <br />$3,674.91 <br />$63,543.98 <br />$2,580.59 <br />$4,194.88 <br />Establish 3H:1V slopes <br />DOZER <br />39.14 <br />Rip compacted pit area <br />RIPPER <br />3.12 <br />Distribute topsoil over disturbed area in Phase 1 <br />DOZER <br />18.51 <br />Revegetate disturbed area (approx 22 acres) <br />REVEGE <br />40.00 <br />Reclaim 5 monitoring wells <br />BOREHOLE <br />10.00 <br />Mobilize reclamation crew /equipment <br />MOBILIZE <br />6.00 <br />SUBTOTALS: <br />126.77 <br />$104,250.06 <br />Task description: July 13, 2011 Inspection <br />King Mountain Sand & <br />Site: Gravel Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 <br />7/29/2011 <br />DMC <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />Permit Action: <br />State: Colorado <br />County: Routt <br />COST SUMMARY <br />DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and /or administration: 5.00 <br />CONTINGENCY: 0.00 <br />2011 Midterm ;view Permit/Job #: M1978314 <br />2.02 Total = <br />1.05 Total = <br />63.39 Total = <br />10.00 Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />Abbreviation: None <br />Filename: M314 -000 <br />Total = <br />Total = <br />$2,105.85 <br />$1,094.63 <br />$3,711.83 <br />$10,425.01 <br />$17,337.32 <br />$121,587.38 <br />500.00 <br />$0.00 <br />$6,079.37 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $23,916.69 <br />TOTAL BOND AMOUNT (direct + indirect) = $128,166.75 <br />