My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-02_INSPECTION - M1978314
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1978314
>
2011-08-02_INSPECTION - M1978314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:26 PM
Creation date
8/4/2011 2:21:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978314
IBM Index Class Name
INSPECTION
Doc Date
8/2/2011
Doc Name
Inspection report
From
DRMS
To
King Mountain Gravel, LLC
Inspection Date
7/13/2011
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Machine <br />Description <br />Weight/ <br />Unit <br />(TONS) <br />Owner ship <br />Cost/hr/ unit <br />Haul Rig <br />Cost/hr /unit <br />Fleet <br />Size <br />Haul Trip <br />Cost/hr/ <br />fleet <br />Return Trip <br />Cost/hr/ fleet <br />DOT Permit <br />Cost/ fleet <br />Cat D9R - 9U <br />(2005) <br />67.38 <br />$57.16 <br />$125.45 <br />2 <br />$365.22 <br />$250.90 <br />$500.00 <br />Drill/Broadcast <br />Seeder with Tractor <br />25.00 <br />$39.59 <br />$88.67 <br />1 <br />$128.26 <br />$88.67 <br />$250.00 <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Light Duty Pickup, 4x4, 1 T. Crew <br />$20.91 <br />1 <br />$20.91 <br />$20.91 <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />Task description: Mobilize reclamation crew /equipment <br />King Mountain Sand & <br />Site: Gravel Mine <br />PROJECT IDENTIFICATION <br />Task #: 07A State: Colorado <br />Date: 7/29/2011 County: Routt <br />User: DMC <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Cost Breakdown: <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Truck Tractor Description: <br />Truck Trailer Description: <br />Permit Action: <br />2011 Midterm Review Permit/Job #: M1978314 <br />Shift basis: <br />Cost Data Source: <br />GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />NON ROADABLE EQUIPMENT: <br />ROADABLE EQUIPMENT: <br />Subtotals: <br />Subtotals: <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M314 -07a <br />1 per day <br />CRG Data <br />$493.48 <br />$339.57 <br />$750.00 <br />$20.91 <br />$20.91 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.