My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-01_REVISION - M2002004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002004
>
2011-08-01_REVISION - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:20 PM
Creation date
8/4/2011 9:37:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Revision
Doc Date
8/1/2011
Doc Name
Response
From
OSE
To
DRMS
Type & Sequence
AM1
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES /W/ <br />DIVISION OF WATER RESOURCES <br />Response o Reclamation Permit Amendment Application Consideration <br />DATE: August 1, 2011 <br />TO: Berhan M. Keffelew, Environmental Protection Specialist <br />CC: Division 2 Office; District 15 Water Commissioner <br />FROM: Caleb Foy, E.I.T. Cg F <br />RE: Red Rock Plant & Limestone Mine, File No. M-2002-004 <br />Operator: GCC Rio Grande, Inc. <br />Contact: Gina Nance - (719) 647 -6800 <br />Secs. 13,23,24,25/18,19,30, Twp. 22S, Rng. 64/65W, 6 P.M., Pueblo County <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />CONDITIONS FOR APPROVAL <br />The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on -site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />COMMENTS: <br />RECEIVFr <br />AUG 022011 <br />Division of Reclarn ;, <br />Mining & Safi;:; <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 • Fax: 303 - 866 -3589 <br />http://water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.