Laserfiche WebLink
DATE: August 2, 2011 <br />TO: Berhan M. Keffelew, Environmental Protection Specialist <br />CC: Division 2 Office; District 14 Water Commissioner <br />FROM: Caleb Foy, E.I.T. CR:f <br />RE: St. Barbara Sand & Gravel Mine, File No. M- 2004 -013 <br />Operator: Pete Lien & Sons, Inc. <br />Contact: Paul Banks — (303) 274 -4277 <br />Sec. 1, Twp. 21S, Rng. 63W, 6 P.M., Pueblo County <br />COMMENTS: <br />DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />Response to Reclamation Permit Amendment Application Consideration <br />CONDITIONS FOR APPROVAL <br />• If stormwater is contained on -site, it must infiltrate into the ground or be released to the natural <br />stream system within 72 hours, or all work must cease until a substitute water supply plan, or <br />augmentation plan approved by water court, is obtained. Reclamation plans must ensure water will <br />not be retained onsite for more than 72 hours unless an augmentation plan approved by water court <br />is obtained. <br />• The proposed operation will consume ground water by: ® evaporation, ® dust control, <br />❑ reclamation, ® water removed in the mined product, ❑ processing, ❑ other :. <br />The applicant shall follow the conditions set forth in permit no. 62251 -F and in the current substitute <br />water supply plan which is valid through December 31, 2012. <br />• Other: The proposed reclamation plan will require a water storage right from the Division 2 Water <br />Court. The proposed lined water storage shall be filled with a legal supply of water. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303- 866 -3581 • Fax: 303- 866 -3589 <br />http://water.state.co.us <br />John W. Hickenlooper <br />Governor <br />Mike King_ Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />