Laserfiche WebLink
-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV- 2011 -003 <br />NATURE OF VIOLATION: <br />Failure to obtain a permit prior to conducting surface coal mining and reclamation operations. Failure <br />to contain areas disturbed by surface coal mining and reclamation operations within the boundaries <br />authorized on permit application maps. Failure to include in the approved permit application an <br />accurate map or plan clearly showing the boundaries of land to be affected. Failure to include in the <br />permit application a plan where appropriate for backfilling, grading, compacting, soil stabilization, and <br />revegetation of all affected lands within the proposed permit area. Failure to conduct all surface coal <br />mining and reclamation operations only as described in the approved application. Failure to comply <br />with the terms and conditions of the permit, all applicable performance standards of the Act, and the <br />requirements of the Rules. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT <br />SECTION(S) 34 33 109(1); 34 33 110(2)(1); 34 33 110(2)(n) <br />REGULATION <br />SECTION(S) 2.05.2(2); 2.05.3( :2.07.7(6); 2.07.7(7); 2.07.7(8) <br />PERMIT <br />SECTION(S) Map 11 Sheet 3 (4/22/11) of the application; Parts IV.C.7, C.8, and C.9 of the Permit <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES <br />Areas in the vicinity of the "C &W Train Shop ", the "10 Stall Garage ", and the "C &W Trains Sand <br />Loading Bldg" (Map 11 -Sheet 3) where mine equipment has been laid down and/or stored outside the <br />approved disturbed area boundary and in some places outside the approved permit boundary. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />Step 1: Submit a technical revision addressing in the approved application the areas identified above <br />that have been affected by surface coal mining and reclamation operations. <br />Step 2: Obtain final approval of the technical revision and submit as necessary an appropriate amount of <br />reclamation bond. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />Ste. 1: On or before Au st 12 2011 <br />Step 2: On or before October 21, 2011 <br />NOV Foi (3/95) <br />WHITE - File <br />YELLOW - Operator <br />PINK - Specialist <br />