My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-22_PERMIT FILE - X201114214
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X201114214
>
2011-07-22_PERMIT FILE - X201114214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:56 PM
Creation date
8/1/2011 10:14:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201114214
IBM Index Class Name
PERMIT FILE
Doc Date
7/22/2011
Doc Name
NOI Application
From
Western Fuels Association, Inc
To
DRMS
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Form No. <br />GWS -25 <br />APPLICANT <br />APPROVED <br />SWK <br />OFFICE OF THE STATE ENGINEER <br />COLORADO 1313 DIVIISIION OF Denver, ESOURCES <br />o R <br />(303) 866 -3581 <br />WESTERN FUELS - COLORADO LLC <br />MURARI P SHRESTHA <br />1100 W 116TH AVENUE <br />WESTMINSTER, CO 80234- <br />(303) 254 -3071 <br />PERMIT TO CONSTRUCT A WELL <br />State Engineer <br />LIC <br />WELL PERMIT NUMBER 285654 <br />DIV. 4 WD60 DES. BASIN MD <br />APPROVED WELL LOCATION <br />MONTROSE COUNTY <br />114 114 Section 25 <br />Township 47 N Range 16 W New Mex P.M. <br />DISTANCES FROM SECTION LINES <br />Ft. from Section Line <br />Ft. from Section Line <br />UTM COORDINATES (Meters,Zone:13,NAD83) <br />Easting: Northing: <br />f <br />ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT <br />CONDITIONS OF APPROVAL <br />1) Thls well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit <br />does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from <br />seeking relief In a civil court action. <br />2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402 -2, unless approval <br />of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation <br />Contractors in accordance with Rule 18. <br />3) Approved pursuant to CRS 37- 92- 602(3)(b)(I) for uses as described in CRS 37- 92- 602(1)(f). Use of this well is limited to <br />monitoring water levels and/or water quality sampling. <br />4) This well must be equipped with a locking cap or seal to prevent well contamination or possible hazards as an open well. <br />The well must be kept capped and locked at all times except during sampling or measuring. <br />5) Records of water level measurements and water quality analyses shall be maintained by the well owner and submitted to <br />the Division of Water Resources upon request. <br />6) Upon conclusion of the monitoring program the well owner shall plug this well in accordance with Rule 18 of the Water <br />Well Construction Rules. A Well Abandonment Report must be completed and submitted to the Division of Water <br />Resources within 60 days of plugging. <br />7) The owner shall mark the well In a conspicuous place with the well permit number and name of aquifer as appropriate, <br />and shall take necessary means and precautions to preserve these markings. <br />8) This well must be constructed by or under the supervision of a licensed well driller or other authorized individual according <br />to the Water Well Construction Rules. if non- standard construction is anticipated, a variance request must be submitted In <br />accordance with Rule 18 and approved prior to well construction. <br />9) A Well Construction and Test Report (Form GWS -31), Including lithologic log must be submitted by the individual <br />authorized to construct the well. For non - standard construction, the report must include an as -built drawing showing <br />details such as depth, casing, perforated zones, and a description of the grouting type and interval. <br />10) Pursuant to Rule 6.2.3 of the Water Well Construction Rules, the well construction contractor shall submit the as -built well <br />location on work reports required by Rule 17.3 within 60 days of completion of the well. The measured location must be <br />accurate to 200 feet of the actual location. The location information must include a GPS location (UTM coordinates) <br />pursuant to the Division of Water Resources' guidelines. <br />NOTE: Issuance of this permit does not guarantee that this well can be converted to a production well under a future <br />permit. Additionally, pursuant to Rule 14.2 of the Water Well Construction Rules (2 CCR 402 -2), monitoring holes <br />constructed pursuant to a monitoring hole notice shall not be converted to a production well. (Upon obtaining a permit from <br />the State Engineer, a monitoring hole may be cony d to a monitoring well, recovery well for remediation of the aquifer, or <br />> a dewetoring eyotei i far doweteieg till aq uifer.) .r ? //i <br />--yw S <br />/97.1. 1 ���j <br />sy , <br />AT <br />• k• <br />e k !: <br />D T <br />
The URL can be used to link to this page
Your browser does not support the video tag.