Laserfiche WebLink
12. Primary Present Land Use (check only one): <br />❑ Cropland(CR) El Pastureland(PL) <br />/ <br />Rangeland(RL) 0 Forestry(FR) <br />❑ Residential(RS) Recreation(RC) <br />❑ Developed Water Resources(WR) <br />13. Estimated Beginning Date of Contract: <br />13.1 Estimated completion date of contract: <br />- 2 - <br />10. Primary Mine Entrance Location (report in either Latitude/Longitude Q$ UTM): <br />Latitude/Longitude: <br />Example: (N) 39° 44' 12.98" <br />(W) 104° 59' 3.87" <br />Latitude (N): deg min sec (2 decimal places) <br />Longitude (W): deg min <br />OR <br />Example: (N) 39.73691° <br />(W) - 104.98449° <br />Latitude (N) 3 7 . G el &.7.eeao(5 decimal places) <br />Longitude(W) .''I / 746, Oasro(5 decimal places) <br />OR <br />Universal Tranverse Mercator (UTM) <br />Example: 201336.3 E NAD27 Zone 13 <br />4398351.2 N <br />sec (2 decimal places) <br />UTM Datum (specify NAD27, NAD83 or WGS 84) NaCI 83 Zone 12 <br />Easting <br />Northing <br />11. Primary Future (Post - mining) Land Use (check only one): <br />Cropland(CR) fi Pastureland(PL) Li General Agriculture(GA) <br />! Rangeland(RL) Forestry(FR) Q Wildlife Habitat(WL) <br />0 Residential(RS) 0 Recreation(RC) 0 Industrial/Commercial(IC) <br />0 Developed Water Resources(WR) ❑ Solid Waste Disposal(WD) <br />❑ General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />▪ Mining(MN) <br />CS <br />/6 ala irl <br />6 "" 017 15 a6/1 <br />