Laserfiche WebLink
1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.700 <br />(FND -MF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />1.438 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Adjusted unit production: 610.28 LCY /hr <br />Adjusted fleet production: 1220.56 LCY/hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />Net correction: 1.0026 <br />2 Dozer(s) <br />$0.273/LCY <br />5.77 Hours <br />$1,921.65 <br />Task # 003 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />