My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-28_REVISION - M1988052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988052
>
2011-07-28_REVISION - M1988052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:24 AM
Creation date
7/29/2011 7:44:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988052
IBM Index Class Name
REVISION
Doc Date
7/28/2011
Doc Name
FW Increase
From
DRMS
To
Rick Hunt
Type & Sequence
SI1
Email Name
JLE
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Grading highwall in south pit <br />DOZER <br />N N N - --� <br />5.72 <br />$1,906.09 <br />$807.08 <br />$1,921.65 <br />$8,616.68 <br />$2,450.70 <br />Grading highwall north pit <br />DOZER <br />2.42 <br />Spreading topsoil over the affected land <br />DOZER <br />5.77 <br />Revegetation of Affected Land <br />REVEGE <br />0.00 <br />Mobilization <br />MOBILIZE <br />4.42 <br />SUBTOTALS: <br />18.33 <br />$ $15,702.20 <br />Task description: Cost Summary <br />Site: Big R Pit <br />TASK LIST (DIRECT COSTS) <br />COST SUMMARY <br />Permit Action: <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado <br />Date: 7/20/2011 County: Elbert <br />User: JLE <br />Agency or organization name: DRMS <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $317.18 <br />Performance bond: 1.05 Total = $164.87 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $1,570.22 <br />TOTAL 0 & P = $2,052.27 <br />CONTRACT AMOUNT (direct + O & P) _ $17,754.47 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and /or administration: 5.00 <br />15 July 2011 <br />Inspection <br />Permit/Job #: M1988052 <br />Abbreviation: None <br />Filename: M052 -006 <br />Total = <br />Total = <br />0.00 <br />$0.00 <br />$887.72 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $2,939.99 <br />TOTAL BOND AMOUNT (direct + indirect) = $18,642.19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.