Laserfiche WebLink
REASON FOR INSPECTION: <br />Surety Related <br />BOND CALCULATION TYPE: <br />Complete Bond <br />BOND AMOUNT: <br />$5,100.00 <br />DATE OF COMPLAINT: <br />NA <br />POST INSP. CONTACTS: <br />None <br />JOINT INSP. AGENCY: <br />None <br />WEATHER: <br />Clear <br />IN CTO S J � ljEii J.IRE: <br />�t$ <br />SIGNATURE DATE: <br />July 28, 2011 <br />MINE NAME: <br />Big R Pit <br />MINE/PROSPECTING ID #: <br />M- 1988 -052 <br />MINERAL: <br />Sand and gravel <br />COUNTY: <br />Elbert <br />INSPECTION TYPE: <br />Surety- Related Inspection <br />INSPECTOR(S): <br />Jared L. Ebert <br />INSP. DATE: <br />July 15, 2011 <br />INSP. TIME: <br />09:50 <br />OPERATOR: <br />Rick L Hunt <br />OPERATOR REPRESENTATIVE: <br />Rick Hunt <br />TYPE OF OPERATION: <br />110c - Construction Limited Impact <br />. COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />vi i�2 O <br />MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866 -3567 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />1.) INSPECTION TOPIC: Financial Warranty <br />PROBLEM: The financial warranty is not adequate to reclaim the site in accordance with the approved <br />reclamation plan. This is a failure to maintain the proper financial warranty amount to complete reclamation of <br />the affected lands pursuant to C.R.S. 34- 32.5- 117(4)(b) of the Act. <br />CORRECTIVE ACTIONS: The Operator shall submit adequate financial warranty, as determined by the Division. <br />The Division will send a separate surety increase notice to the Operator. The Operator will have 60 days from <br />the date of that notice to post the additional financial warranty. <br />CORRECTIVE ACTION DUE DATE: 9/26/11 <br />2.) INSPECTION TOPIC: Off - site Damage <br />PROBLEM: The Operator has mined in the wrong location, this is a problem at this time for failure to follow the <br />mining plan as described in the approved application pursuant to C.R.S. 34- 32.5 -110 (1) (a) (VII) <br />CORRECTIVE ACTIONS: The Operator will need to submit an Amendment to the permit to update the location of <br />the mining area. The Amendment must be submitted by September 26, 2011 and in an approvable form by <br />November 28, 2011. <br />CORRECTIVE ACTION DUE DATE: 9/26/11 <br />► , le atii <br />Page 1 of 4 <br />