Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description <br />Subtotals : <br />$0.00 <br />JOB TIME AND COST <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non - <br />Roadable <br />Equipment <br />Haul time (hours) = 0.90 <br />Return time (hours) = 0.90 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 2.80 <br />Total <br />Cost/hour /unit <br />Roadable <br />Equipment <br />0.90 <br />0.90 <br />NA <br />NA <br />1.80 <br />Fleet Size Haul Trip <br />(No. units) Cost/hr /fleet <br />Nearest major city or town within project area region : <br />Total one -way travel distance : <br />Average travel speed : <br />Total non - roadable mob /demob cost * : <br />* two round trips with haul rig <br />Total roadable mob /demob cost ** : <br />** one round trip, no haul rig <br />Total job time : <br />Total job cost : <br />Return Trip <br />Cost/hr /fleet <br />$0.00 <br />Monte Vista <br />45.0 miles <br />50.0 mph <br />$1,114.41 <br />$0.00 <br />5.60 <br />$1,114 <br />sheet 2 of 2 <br />hours <br />