My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-28_HYDROLOGY - C2009087
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C2009087
>
2011-07-28_HYDROLOGY - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:08 PM
Creation date
7/28/2011 1:17:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
HYDROLOGY
Doc Date
7/28/2011
Doc Name
2nd Quarter 2011 Quarterly Sedimentation Pond Inspection
From
Peabody Sage Creek Mining, LLC
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTOR'S NAME: Dennis Jones <br />NPDES I.D. NO.: CO- 0048275 D.P. 003 <br />FACILITY CONFIGURATION: Diked Pond <br />SITE NAME: Northwest Impoundment #003 <br />MINE NAME: Peabody Sage Creek Mine <br />MINE I.D. NO.: CDRMS Permit No. C- 2009 -087 <br />1. Foundation preparation (removal of vegetation, stumps, topsoil: <br />2. Lift thickness: <br />3. Compaction according to approved plan: <br />4. Burning (specify extent and location): <br />5. Angle of slope: 2:1 upstream, 3:1 downstream <br />6. *Seepage (specify location, color, and approximate volume) <br />From underdrain pipes: <br />At isolated points on embankment slopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />7. Cracks or scarps on crest: <br />8. Cracks or scarps on slope: <br />9. Sloughing or bulging on slope: <br />10. *Major erosion problems: <br />11. Surface movements in valley bottom or on hillside: <br />12. *Erosion of toe: <br />13. *Water impounded against toe: <br />14. Existing embankment freeboard: (normal = 4.9') <br />15. Increase Decrease in water level: Kt, <br />16. Cracks, bulging, or erosion on upstream face: <br />17. Visible sumps or sinkholes in slurry surface: <br />18. *Clogging <br />Spillway channels and pipes: <br />Decant system: <br />Diversion ditches: <br />19. *Cracking or crushing of pipes <br />Spillway pipes: <br />Decant system: <br />20. Trash racks clear and in place: <br />21. Discharge rate (gpm) <br />*Major adverse changes in these items could cause instability and should be reported to the <br />Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions noted in <br />these items should normally be described (extent, location, volume, etc.) in the space on the <br />back of this sheet. <br />a.P.Q O k <br />PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />DATE: <br />Circle or write in appropriate response <br />DATE LAST INSPECTION: 3 ' t- 1( <br />LOCATION: SE',, SW'%, Sec. 27, T6N, R87W <br />LOCATION: 7.1 mi. SE of Hayden, CO <br />OWNER'S REP.: Mike Ludlow <br />Yes <br />12 in. <br />Yes <br />No <br />Total = 5:1 <br />N/A <br />Yes � o N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes N N/A <br />` l. 4 feet <br />feet <br />Yes No N/A <br />N/A <br />Yes (11D N/A <br />N/A <br />Yes a) N/A <br />Yes ® N/A <br />N/A <br />Ye No N/A <br />as.� <br />
The URL can be used to link to this page
Your browser does not support the video tag.