Laserfiche WebLink
• <br />• <br />• <br />Section 02200 <br />Earthworks <br />amec <br />CONTRACTOR may use any type of earthmoving or excavating equipment unless otherwise noted in the <br />SPECIFICATIONS, provided the equipment is in a satisfactory condition, complies with applicable rules and <br />regulations, is of such capacity that the construction schedule can be maintained as planned by <br />CONTRACTOR, and is approved by MANAGER. <br />S: \Projects \1125E CCV CQA \I - Tech Specs \02200.rl .doc <br />* ** END OF SECTION * ** <br />Page 18 of 18 September 3, 2008 <br />Revision 1 <br />