My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (116)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (116)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
7/27/2011 12:42:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. III, Appendix E, Specifications.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Section 02200 <br />Earthworks <br />amec <br />1. Low Volume Solution Collection Fill shall be placed over the geomembrane in the locations <br />shown on the DRAWINGS. <br />2. CONTRACTOR shall condition Low Volume Solution Collection Fill to allow a surface <br />that does not cause rutting or other deleterious effects. <br />3. CONTRACTOR shall place Low Volume Solution Collection Fill around the Low Volume <br />Solution Collection Vertical Riser Pipes in maximum 12 -inch loose lifts and compact using <br />a hand operated vibratory plate compactor to the satisfaction of the MANAGER and <br />CERTIFYING ENGINEER. Low Volume Solution Collection Fill shall be worked under <br />the Low Volume Solution Collection Rise pipe haunches by hand to provide uniform <br />support of the pipe. <br />4. Prior to placing the Low Volume Solution Collection Fill, CONTRACTOR shall verify by <br />visual inspection that the underlying geosynthetics are free of holes, tears, wrinkles, or <br />foreign objects. MANAGER and CERTIFYING ENGINEER will inspect the <br />geosynthetic for wrinkles prior to placement of Low Volume Solution Collection Fill. As <br />instructed by MANAGER, CONTRACTOR shall "work out" wrinkles to the satisfaction <br />of MANAGER and CERTIFYING ENGINEER prior to placement of the Low Volume <br />Solution Collection Fill. In all cases, wrinkles shall not be of a size that they could fold back <br />on themselves. Wrinkles greater than one foot shall be removed and repaired by the <br />INSTALLER. <br />5. CONTRACTOR shall place Low Volume Solution Collection Fill in a single 36 -inch loose <br />lift. The tracked equipment shall operate only over previously placed Low Volume Solution <br />Collection Fill. CONTRACTOR shall not operate equipment directly on geosynthetics. <br />Only a dozer with a ground pressure not exceeding 14.7 psi can be used to place Low <br />Volume Solution Collection Fill. Equipment used for placement will not be allowed to pivot <br />on one track (i.e., no abrupt or sharp turns). There shall be no downhill placement on slopes <br />steeper than 4H:1 V. Material can be placed along contours if buttressed from below. <br />6. Rubber tired construction equipment shall not be allowed to travel over the geomembrane or <br />on top of Solution Collection piping unless a thickness of at least 45 inches of Low Volume <br />Solution Collection Fill has been placed over the geomembrane and on top of Solution <br />Collection piping. The CONTRACTOR will be required to demonstrate to the <br />MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER that the equipment <br />and procedures used are not detrimental to the geomembrane and piping, at no cost to <br />CC &V. Off road haul truck traffic shall require a minimum of 60 inches for Cat 773 (or <br />equivalent) of Low Volume Solution Collection Fill placed over the geomembrane and <br />solution collection piping, and a minimum of 120 inches for CAT 777 (or equivalent) of <br />Low Volume Solution Collection Fill placed over the geomembrane and solution collection <br />piping. <br />7. When placing Low Volume Solution Collection Fill the maximum acceptable drop height is <br />3 feet. <br />8. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of <br />any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR to <br />remove Low Volume Solution Collection Fill to expose the geosynthetics. <br />CONTRACTOR shall uncover, repair any observed damage of the underlying <br />S: \Projects \1125E CCV COA \I - Tech Specs \02200.rl.doc <br />Page 11 of 18 September 3, 2008 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.