Laserfiche WebLink
AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC continuously monitored the DCF placement. <br />AMEC observed the installation of the high volume solution collection system. <br />AMEC observed the backfilling of the high volume solution collection risers /manifold. <br />AMEC observed ore placement near the high volume solution collection risers. <br />ame <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue SLF placement within the Phase 5 VLF footprint. <br />Continue geomembrane installation within the Phase 5 VLF footprint. <br />Continue anchor trench backfill. <br />Continue installation of the high volume solution collection system. <br />Continue DCF placement. <br />Continue ore placement at south toe berm. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V :: <br />CC &V held a Weekly Construction meeting on October 5, 2010. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />AMEC: <br />None <br />Others: <br />None <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />VLF Weekly Report WE 10.09.10.D <br />