QA Monitoring and Test Results 2010, VOL. III, Appendix D, Weekly Reports, Part 13.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />19,064 <br />142,010 <br />Total <br />19,064 <br />142,010 <br />r <br />ame0 <br />2) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement within the Phase 5 VLF continued. DCF was placed in the <br />area show on Figure 6. The DCF was hauled from the processing area to the placement area <br />using CAT 740 haul trucks. The DCF was placed in a 2 -foot lift using a CAT D -6 LGP dozer <br />except where haul routes were established. Haul route consisted of five -foot lifts to be spread <br />into 2 -foot lifts later. Laborers were present at all times during placement holding the high <br />volume collection piping in place, removing debris /sandbags, and assisting the dozer operator <br />with lift thickness. All DCF was placed on previously approved primary geomembrane. AMEC <br />field representatives monitored the DCF placement constantly. <br />DCF was also placed over previously placed DCF constructing a 5 -foot road to access the <br />south toe berm. This was performed using a CAT D -6 LGP dozer. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />Drain Cover Fill (DCF) was processed during the week. <br />IV) VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF continued performing deployment, <br />seaming, and repair /QC activities. Geomembrane installation was performed in the area shown <br />on Figure 3. Approximately 237,803 square feet of primary 100mil LLDPE was deployed <br />using a John Deere 200 excavator and a John Deere 544 front -end loader with spreader -bar <br />attachments. Subgrade was inspected and approved by AMEC and Lone Star representatives <br />prior to geomembrane deployment (see Figure 3). Approximately 11,964 linear feet of seam <br />was fusion welded using up to two fusion welding machines. Twenty -five destructive test <br />samples were marked during fusion seaming. All destructive tests performed were within <br />project specifications. Non - destructive testing was performed for fusion welded seams. Repairs <br />were performed using the extrusion welding method for all marked defects. Vacuum testing <br />was performed for all extrusion welded seams and repairs. <br />B) Anchor Trench <br />1) VLF <br />Anchor trench backfill was performed between stations C3 +00 ( + / -) and C7 +50 (excluding the <br />low volume riser boots) and between stations G23 +00 ( + / -) and G30 +00 ( + / -) using a John <br />Deere 35D excavator and laborers. An AMEC representative observed and inspected the <br />VLF Weekly Report WE 09.25.10.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.